Emerald Energy Plc
25 March 2008
Khurbet East Field Update, Block 26, Syria
Emerald Energy Plc ('Emerald' or the 'Company') would like to provide the
following update on activities in the Khurbet East field in Block 26, Syria.
Drilling of the Khurbet East No.5, the first horizontal development well in the
Khurbet East field, has commenced. It is designed as a horizontal producer with
a measured depth of approximately 2,900 metres including a 700 metre horizontal
section in the Cretaceous Massive reservoir. The well is expected to take
approximately 60 days to drill and evaluate. It will then be completed and
suspended as an oil producer to commence production after the installation of an
early production facility, scheduled to commence operation by the fourth quarter
of 2008.
Emeralds' Chief Executive Officer, Angus MacAskill, said:
'The drilling of horizontal wells in Khurbet East was indicated in engineering
studies to optimise field development through the higher well productivities and
oil recoveries associated with this technology
required field
- 28 Mar 2008 15:15
- 110 of 405
Resuming ascent...all's well !
required field
- 02 Apr 2008 09:11
- 111 of 405
Good weather....making good progress along the ridge....an IEC drop on one side...an WSM on the other...hopefully will come through unscathed !
niceonecyril
- 02 Apr 2008 10:11
- 112 of 405
Looks like we may have a real break out, and not before time imho?
cyril
DFGO
- 05 Apr 2008 11:09
- 113 of 405
niceonecyril
If link don't work go to FOGL thread post 315 open link slide10 valuation very interesting
http://www.fogl.com/documents/FalklandOilandGasLimited-CorporatePresentation-2008-03-18.pdf
niceonecyril
- 06 Apr 2008 10:14
- 114 of 405
DFGO if you click on the chain link above the this box you get,
http://www.fogl.com/documents/FalklandOilandGasLimited-CorporationPresentation-2008-03-18.pdf
Thanks most interesting.
cyril
DFGO
- 07 Apr 2008 08:39
- 115 of 405
Emerald Energy PLC
07 April 2008
Emerald Energy Plc
7 April 2008
Agerato Exploration and Production Contract Award in Colombia
Emerald Energy Plc ('Emerald' or the 'Company') is pleased to announce that it
has been awarded a new exploration & production contract in Colombia. The
Agerato Contract, in which Emerald has a 100% working interest, covers an area
of 170 sq. km and is located in the Putumayo Basin in south-west Colombia,
approximately 75 km to the south-east of the Company's Maranta exploration &
production contract area.
The initial phase of the exploration period is 12 months and the minimum work
programme comprises the acquisition of 35 km of new 2D seismic data and the
re-processing of 40 km of existing 2D seismic data. Emerald expects the
prospective depths to be relatively shallow, at approximately 7,000 ft. The
second phase of exploration, if entered, would include the drilling of a well.
The Agerato Contract has been awarded by the ANH, the National Hydrocarbon
Agency of Colombia, and a copy of the model contract terms can be found on the
ANH website (
www.anh.gov.co
).
Emeralds' Chief Executive Officer, Angus MacAskill, said:
'We are very pleased with the award of this new contract, building our position
in the prospective Putumayo Basin and increasing our activities under the ANH E&
P Contracts. During the first phase we will acquire and interpret data to
determine the potential for exploration drilling in the area.'
DFGO
- 07 Apr 2008 08:43
- 116 of 405
niceonecyril
thanks
I could not understand why my links never work here
required field
- 07 Apr 2008 10:59
- 117 of 405
We are now approaching the 3 peak now ...difficult hurdle to overcome...unknown mountain territory beyond !
niceonecyril
- 07 Apr 2008 11:07
- 118 of 405
RF, EEN hit 360p on announcement of interest in Block 26, Syria a couple of years ago. This time next month i believe things will get very exciting as we will be
close to results from the horizontal(KE5) presently being drilled, a postive flow rate
from this "production well" will imo see 350/400p quite easily?
cyril
required field
- 07 Apr 2008 11:11
- 119 of 405
Hope so niceonecyril...if EEN hit 350/400p, I will be over the moon ! cheers !
required field
- 10 Apr 2008 09:40
- 120 of 405
Through the 300p barrier....!, the climbing expedition is a triumph !
required field
- 10 Apr 2008 14:15
- 121 of 405
Possible breakout above the 3 barrier....the rest of the market doesn't look so good though...let's hope it stays there !
required field
- 10 Apr 2008 14:54
- 122 of 405
Very bullish upward spikes on this now...
niceonecyril
- 10 Apr 2008 18:16
- 123 of 405
Nice to see it above the 3,though not so sure its a spike, more to do with the oil
section up in general?
cyril
required field
- 10 Apr 2008 18:47
- 124 of 405
Brief spike up to 315p and then down,....overall, climbing steadily !
required field
- 20 Apr 2008 10:06
- 125 of 405
Breakout from the 3 area....
niceonecyril
- 24 Apr 2008 22:06
- 126 of 405