tallsiii
- 11 Apr 2005 14:30
EKA are expecting to mine 3.8 million lbs of Molybdenum this year. For the more sceptical amongst you, read this to confirm:
http://moneyam.uk-wire.com/cgi-bin/articles/200412150700023844G.html
They own the mine and the molydbenum in it has been independently varified as stated in the announcement linked above.
Molydbenum currently trades at around $38.50 per lb, you can check this at:
http://www.monterrico.co.uk/s/MetalPrices.asp
so do the sums 3.8m x $39.25 = $149m = 82m
Eureka Mining's market cap is 26m
In 2006 they expect to pull over 10,000 tonnes (20m lbs) of Moly out of that mine.
On top of all that they have recently aquired a mine in Russia with estimated contained metal of 3.32 million tonnes of copper, 3.26 million
ounces of gold and 98.9 million pounds of molybdenum. They hope to complete the feasibility study for this one in 2006:
http://moneyam.uk-wire.com/cgi-bin/articles/200501130700033169H.html
jimbobGR
- 19 Oct 2005 17:24
- 112 of 215
5.8% DROP TODAY, any ideas
jimbobGR
- 31 Oct 2005 10:14
- 113 of 215
Buying opportunity, or something more sinister?
Opinions welcome
tallsiii
- 01 Nov 2005 16:17
- 114 of 215
The company so far is not living up to what was promised. Time schedules have been set back and expected volumes have been reduced while unit cost forecasts have been edging up. So it is no suprise that the SP has dived a bit.
Though if the current set of forecasts is to be believed, then we should be looking at a PE of 2 for 2006 with added bonus of Chebinsk being a potential company maker. So I am hanging on in there with a ruduced stake.
proptrade
- 01 Nov 2005 17:16
- 115 of 215
i cut ages ago and will wait for your signal tallsiii....
how are things old boy?
tallsiii
- 21 Nov 2005 14:36
- 116 of 215
The big find at VOG appears to have given a lift to EKA.
Aside from that it may be time to review EKA now that we approach 2006 'the year of production'. The Moly price has stayed up there (currently $30 per lb), contrary to many expert preidcitons for a crash. EKA has now forecast costs at $5-$7 per lb and they talk about average production of 2.7 million lbs per year.
So a conservative 2 million lbs in the first year with a margin of $10 per lb would generate $20 million. That is half their current market cap, and so if they can acheive that then they are currently pretty cheap.
It is also worth noting that the value of the resources in Chebinsk is a serveral times multiple of the recent natural gas discovery made by VOG.
I am not saying it is time to buy now, but unless they dissapoint us again with expectations for 2006, they may have no reason to trace back below where they are now.
tallsiii
- 22 Nov 2005 07:35
- 117 of 215
Looks like EKA is trying to stay with the VOG coat tails. They were both spun off from CER and still both have the same chairman.
The value of the VOG discovery is around $4bn, while the value of the resources at Chebinsk is around $18bn. That compares favourably with the EKA market cap of 30m.
Though the real issue is whether they can get it out of the ground and get it out of Russia without losing too much of it in 'taxes'.
Regulatory Announcement
Go to market news section
Company Eureka Mining PLC
TIDM EKA
Headline JORC Resource
Released 07:00 22-Nov-05
Number 4480U
RNS Number:4480U
Eureka Mining PLC
22 November 2005
Eureka Mining PLC
Chelyabinsk Copper Project Miheevskjoye Deposit - JORC Resource
1.66 Million Tonne Copper and 2.8 Million Ounces Gold
Eureka Mining Plc ("Eureka" or "the Company") (Tic: EKA) today announces that
the Joint Ore Reserves Committee Resource ("JORC") estimate for the Miheevskoye
Copper Deposit at the Chelyabinsk Copper Project has been confirmed by Snowden
Mineral Industry Consultants ("Snowden").
The deposit forms part of the Chelyabinsk Copper Project ("the Project") in the
Southern Urals region of the Russian Federation, approximately 400km south of
the city of Chelyabinsk, one of Russia's largest cities.
These results, initially determined by Perth based consulting firm Resource
Evaluations Pty Ltd ("ResEval") have also now been reviewed and confirmed by
Snowden, one of the world's leading and largest independent resource evaluation
groups.
Highlights
Large JORC resource of 405 Mt at an average grade of 0.41% copper ("Cu")
and 0.22g/t gold ("Au") calculated by ResEval and endorsed by Snowden
Contained metal of 1.66 million tonnes Cu and 2.8 million ounces Au
Mining studies indicate that a high grade starter pit of 0.9% Cu
equivalent with very low mining strip ratio can be mined in the initial
years
High grade significant intersections include:
149m @ 1.19% Cu eq*
277m @ 1.24% Cu eq*
303m @ 1.07% Cu eq*
252m @ 0.90% Cu eq*
216m @ 0.93% Cu eq*
Snowden's independent review suggests the deposit has the potential to
increase in grade with further definition drilling.
* Based on a copper price of US$0.90c per pound and a gold price of US$425 per
ounce
David Bartley, CEO of Eureka Mining said, "This is a substantial resource which
has been confirmed by Snowden, situated in a major industrial area of the world.
We look forward to announcing results of the Chelyabinsk Scoping Study soon."
The Company also wishes to announce that the Shorskoye Molybdenum Project is
still on track for producing cash flow in Q1 06 with the molybdenum ("Mo") price
still at a comfortable level of US$35/lb.
For further information:
David Bartley/Kevin Foo Laurence Read
Chief Executive Officer/Chairman Conduit PR
Eureka Mining Plc Tel: +44 (0)20 7618 8760 /
Tel: +44 (0)20 7921 8810 +44 (0)7979 955923
www.eurekamining.co.uk
The Chelyabinsk Copper/Gold Project
On 13th January 2005, Eureka announced the acquisition of 51% of the Chelyabinsk
Copper/Gold Project in the southern Urals region of Russia and, subject to the
satisfactory conclusion of a feasibility study, the Company has the exclusive
option to acquire 100% of the project.
The Chelyabinsk Copper/Gold Project comprises three separate deposits,
Miheevskoye, Tominskoye and Taruntinskoye. Over 80 km of drilling has been
completed to date, delineating total C1 and C2 resources of 687 million tonnes
at 0.70 per cent Cu equivalent. Contained metal is currently estimated to be
3.57 million tonnes of Cu, 4.2 million ounces of Au and 99 million pounds of Mo.
JORC Resource on Miheevskoye
The Inferred Mineral Resource estimate complies with recommendations in the
Australasian Code for Reporting of Mineral Resources and Ore Reserves prepared
in 2004 by the Joint Ore Reserves Committee ("JORC"). Therefore it is suitable
for public reporting. The ResEval Mineral Resource estimate, confirmed by
Snowden, is summarised in Table 1.
Table 1: Miheevskoye Deposit May 2005 Inferred Mineral Resource Estimate
280mRL to -40mRL, 0.2% Cu Cut-off Grade
Category Tonnes Cu Au Mo S Cu Au
MT % g/t % % T Ounces
----------- -------- ------ ------ ------ ------ --------- ---------
Oxide 16.3 0.55 0.23 0.0036 0.65 89,000 120,000
Transitional 12.8 0.46 0.23 0.0036 0.65 59,000 94,000
Fresh 375.7 0.41 0.22 0.0071 0.93 1,530,000 2,660,000
----------- -------- ------ ------ ------ ------ --------- ---------
TOTAL 404.8 0.41 0.22 0.0068 0.91 1,678,000 2,874,000
----------- -------- ------ ------ ------ ------ --------- ---------
Miheevskoye Deposit
The Miheevskoye deposit is hosted by volcanoclastics and basalts of Upper
Devonian to Carboniferous age. The deposit has a simple geometry of an overall
length over 2.5 km and the width varies from 200m to 400m. The reported Mineral
Resource for the Miheevskoye deposit encompasses the 320m vertical interval from
280mRL to -40mRL which is the limit of drilling at the deposit. A total of 44km
of drilling has been completed on the deposit to date.
To determine the potential of the deposit below the base of drilling, where the
mineralisation remained open, the wireframes were extended an additional 100m
below the drill holes and then interpolated. This portion of the deposit (termed
Mineral Potential) comprises approximately 100 million tonnes and is additional
to the JORC compliant resource quoted in Table 1.
To check the integrity of the previous drilling, a verification drilling
programme was carried out by Eureka in 2005. A total of 5 holes were completed
which returned intersections of similar width and grade compared to the Russian
drilling. This was considered to have confirmed the previous work. In addition,
a large number of samples from the Russian drilling programme were re-analysed
by Eureka. These confirmed the previous results.
The deposit was estimated for Copper by ResEval using Inverse Distance to Power
2 (ID2) grade interpolation, constrained by resource outlines based on
mineralisation envelopes prepared using a nominal 0.20% cut-off grade.
A feature of the deposit which enhances its economic potential is the distinctly
higher grade zone in the northern portion of the deposit. Large zones of
mineralisation in excess of 0.6% copper with gold grades are present suggesting
that a higher than average head grade will be achieved in the early years of
mining at the project.
The internationally recognised consulting group Snowden Mineral Industry
Consultants was commissioned by Eureka to review the ResEval resource estimate.
Snowden endorsed the results and classification of the current estimate. Snowden
have also agreed to prepare the resource estimates to be used in the
pre-feasibility and definitive feasibility studies.
2005/2006 Drilling Programme
Since the resource estimate and mining study was completed, Eureka has commenced
a large drilling campaign with the objective of upgrading the defined resource
to Measured and Indicated Mineral Resource categories as part of the Feasibility
Study. Two Russian diamond drill rigs have been operating at the site since
March, and an additional four rigs commenced operations in early November.
To date, eleven resource definition holes have been completed and results have
been returned from four of the holes. Deeper holes in the high grade areas are
now underway to evaluate the potential for delineating further resources.
In addition to the resource drilling, programmes of confirmation drilling and
specific large diameter metallurgical drilling has been carried out. A summary
of work to date is shown in Table 3.
Table 3: Miheevskoye 2005 Drilling Completed
Type Count Metres
Confirmation 5 966
Metallurgical 7 920
Resource 11 3,202
Total 23 5,088
Appendix 1: Mineral Resource Summary - Miheevskoye Deposit November
2005 Estimate
Undiluted Inferred Mineral Resource, 0.2% Cu Cutoff Grade
------------ ------------ ------- -------- --------- ----------
Class Tonnes Cu % Au g/t Cu T Au oz
Measured - - - - -
Indicated - - - - -
Inferred 404,800,000 0.41 0.22 1,678,000 2,874,000
Total 404,800,000 0.41 0.22 1,678,000 2,874,000
------------ ------------ ------- -------- --------- ---------
The Mineral Resource estimate was completed using the following parameters:
The Miheevskoye resource area extends over a strike length of 2,500m and
includes the 320m interval from 280mRL to -40mRL.
Drill holes used in the estimate included 82 diamond core holes for a
total of 18,373m of drilling. The majority of holes were NQ equivalent
diameter.
Holes in the Miheevskoye area were drilled at approximate section
spacings of 200m except the higher grade northern zone which was drilled at
100m section spacings.
Holes were sampled using half core for all mineralised zones. Visually
unmineralised zones were either unsampled, or sampled using composite chip
samples from intervals from 4m to 10m.
For drilling completed since 1994, copper analyses were carried out
using the XRF technique. Prior to that acid digest with AAS analysis was
generally used.
Quality control data for the portion of the drilling completed between
since 1994 has been reviewed and was found to be satisfactory.
A programme of confirmation holes completed in 2005 was designed to twin
five existing holes at the project. The results of these have returned
similar intersection intervals and grade and are considered to have
verified the previous drilling.
Collar surveys of holes were carried out using conventional surveying
methods (theodolite, EDM) not by GPS.
The majority of historical drill holes have been downhole surveyed by
wireline survey. Readings were taken at 10m intervals down hole.
Wireframes were constructed using cross sectional interpretations based
on mineralised envelopes constructed at a nominal 0.2% Cu cut-off grade.
Zones of 'weathered' and 'fresh' were produced as separate wireframes.
Samples within the wireframes were composited to even 2.0m intervals. No
high grade cuts were used.
A Surpac block model was used for the estimate with a block size of 50m
NS x 25m EW x 10m vertical with sub-cells of 12.5m x 6.25m x 2.5m.
Inverse distance to power 2 (ID2) grade interpolation used an ellipsoid
search ellipse with a first pass radius of 150m and a second pass radius of
300m with the ellipse oriented to match the overall strike and dip of the
mineralised zones.
Bulk density values used for the estimate were 2.03t/m3 for oxide, 2.10t
/m3 for transition and 2.79t/m3 for fresh rock and were based on the values
determined from the Russian test work.
Resource classification was carried out on the basis of continuity of
mineralisation and drill hole spacing. The Mineral Resource was classified
as Inferred.
This information is provided by RNS
The company news service from the London Stock Exchange
END
London Stock Exchange plc is not responsible for and does not check content on this Website. Website users are responsible for checking content. Any news item (including any prospectus) which is addressed solely to the persons and countries specified therein should not be relied upon other than by such persons and/or outside the specified countries. Terms and conditions, including restrictions on use and distribution apply.
2005 London Stock Exchange plc. All rights reserved
PapalPower
- 22 Nov 2005 08:02
- 118 of 215
Looks good.
EKA should start to take off now !
PapalPower
- 22 Nov 2005 09:27
- 119 of 215
Some very good news coming according to the Times rumour today :
From todays RNS :
David Bartley, CEO of Eureka Mining said, "This is a substantial resource which
has been confirmed by Snowden, situated in a major industrial area of the world. We look forward to announcing results of the Chelyabinsk Scoping Study soon"
From the Times today :
http://www.timesonline.co.uk/newspaper/0,,2740-1882907,00.html
Eureka Mining, a sister company to Victoria Oil & Gas, last weeks AIM star rose 12p to 123p on word of a positive drilling update from its Chelyabinsk copper project in Russia.
PapalPower
- 22 Nov 2005 16:06
- 120 of 215
Looks like a good days play from the MM's, paying more than bid for sells, and most buys at full offer, they wanted to get sells today, and did.
The expectation is the rumour from the Times of good news drilling update very soon, and they will want to sell into a large rise on that day, if and when it happens soon !
EKA is the sister company of VOG, is a certain person going to deliver a massive copper find after a massive gas find !?
PapalPower
- 22 Nov 2005 16:19
- 121 of 215
And now the MM's lift it up after sucking some sellers out today ;)
PapalPower
- 22 Nov 2005 16:24
- 122 of 215
An extract from July 05 IC write up (www.investorschronicle.co.uk), this is their latest one and was with a buy rating. Take this extract with the Times rumour and todays RNS ;
But Shorskoye may prove to be a modest operation compared with the Chelyabinsk copper/gold project to the north-west, across the border in Russia. Eureka acquired a 51 per cent stake in the project in January for 250,000, with an option to buy the rest from local partners for as much as $6m. There are three separate deposits and, earlier this month, Barclays Capital (the investment banking arm of Barclays Bank) was appointed as adviser and lead financier on the project. Phase I covers work up to the production of a bankable feasibility study and debt structuring to maximise the borrowing facility; phase II involves sourcing development finance of possibly up to $300m. Barclays' remuneration is in the form of warrants and fees if, and when, finance is secured.
Eureka is also working on two gold exploration projects at Dostyk in central Kazakhstan and at Kentau in the far south of the country close to the Kyrgyz Republic. An in-specie dividend in April 2004 reduced Celtic's shareholding from 44 per cent to 21 per cent.
PapalPower
- 22 Nov 2005 23:25
- 123 of 215
Mr Foo gave some deliverance on VOG, now will he give us deliverence with a positive Chelybinsk update in the coming days/weeks. A positive drilling update would give EKA some serious upside, so lets hope the Times is right and news comes this week or next on Chelybinsk drilling.
PapalPower
- 23 Nov 2005 09:07
- 124 of 215
Opened up at the start today, a good sign we hope.
tallsiii
- 23 Nov 2005 09:43
- 125 of 215
They have already found the copper, billions of pounds worth in the Chelyabinsk mine.
PapalPower
- 23 Nov 2005 12:21
- 126 of 215
tallsiii, if the Times rumour is to be believed then they have found something of great value in the Chelybinsk mine, just how big we will have to wait for the official news to say when it comes.
PapalPower
- 24 Nov 2005 16:43
- 127 of 215
A copy of a post I put on AFN today;
azalea, firstly there is an IC article today that fund managers are becoming more focussed on miners with near term production planned, and moving away from just exploration types, which given the Q1 06 for Eureka, is good news.
_____________
Second there is a tip from Hemscott today for another copper company (www.hemscott.com) and I will copy an extract on copper but removing the company name as its good info for copper.
" Certainly the long-term outlook for copper demand seems very much in ******** favour. With the metal fundamentally tied to economic growth in general, the rise of China and India in particular should ensure the current tightness in supply-demand will be with us for some time yet.
As the company points out, over the past few years demand for copper has grown on average more than the growth of copper production. That led to a supply shortfall in 2003 which widened further during the course of 2004, with the total deficit estimated by some industry experts to be between 600,000 and 1m tonnes.
This, together with the fact that US, China and Japan have all seen healthy industrial growth over the last two years, has led to a recent decline in stockpiles of copper held by the international exchange warehouses, such as the London Metal Exchange.
The world copper price in September 2005 traded above US$1.70/lb. Four years ago the price was US$0.61/lb and it fluctuated between US$0.61/lb and approximately US$0.80/lb over the ensuing two-year period. Towards the end of 2003 the copper price rose sharply and since then it has fluctuated between just under U.S.$1.20/lb and U.S$1.70/lb. Recent strikes in the industry have further curtailed supply and provided support for the price through the third quarter of 2005.
The copper supply-demand dynamic remains tight and, tellingly, ********* points out that he could (as of earlier this week) secure a 27 month forward copper contract at $1.37/lb if he so desired, effectively accounting for the first years supply from ******* at that level. "
__________________
The earlier IC article on EKA is a Buy recommendation at 146p on 15th July 05.
Here is an extract from it (www.investorschronicle.co.uk)
" Within one month of flotation, it had established offices in Kazakhstan and commenced drilling at its Shorskoye high-grade molybdenum project. By the end of that month, it had three diamond drill rigs operating 24 hours a day in temperatures down to -20c. By end-December 2004, almost 10,000 metres of drill core had been logged. And, egged on by sky-high molybdenum prices (used to strengthen and harden steel), the company has fast-tracked the development of part of this mine and hopes to produce the first concentrates by the end of this year - some 12 months earlier than expected. The development costs are likely to be under $10m, using nearby processing facilities.
But Shorskoye may prove to be a modest operation compared with the Chelyabinsk copper/gold project to the north-west, across the border in Russia. Eureka acquired a 51 per cent stake in the project in January for 250,000, with an option to buy the rest from local partners for as much as $6m. There are three separate deposits and, earlier this month, Barclays Capital (the investment banking arm of Barclays Bank) was appointed as adviser and lead financier on the project. Phase I covers work up to the production of a bankable feasibility study and debt structuring to maximise the borrowing facility; phase II involves sourcing development finance of possibly up to $300m. Barclays' remuneration is in the form of warrants and fees if, and when, finance is secured.
Eureka is also working on two gold exploration projects at Dostyk in central Kazakhstan and at Kentau in the far south of the country close to the Kyrgyz Republic. An in-specie dividend in April 2004 reduced Celtic's shareholding from 44 per cent to 21 per cent. "
________________________________
A second article by the IC said buy at 142p on 29th July, saying the price would be higher by year end.
Extract here;
"Eureka Mining has signed a joint venture with Kazakhstan's state uranium company to accelerate the molybdenum production from Shorskoye. First production is planned for early 2006, which should make Eureka the first Aim company with a productive molybdenum mine"
_______________________________
Here is an extract from 23rd Sept IC article on Moly and Copper
" The most eye-catching of these lately has been number 42 in the periodic table - molybdenum. This alloying element only came into widespread industrial use in the 20th century, and it isn't even as if we use huge quantities of it today. World consumption of 'moly' amounts to around 155,000 tonnes a year, according to the International Molybdenum Association. But its price has rocketed over the past year to a peak of $40 a pound - or around $90,160 a tonne (see chart).
The main reason for this surge has been increasing demand. Molybdenum's main end use is as a hardening agent in the production of stainless and alloy steels, global output of which picked up sharply in 2004. As is so often the case these days, China was responsible for much of the hike in demand. The booming aerospace and defence industry has also contributed, owing to its heavy consumption of specialist heat-resistant alloys.
Until recently, supply of molybdenum has been relatively unresponsive to this rising demand. According to the US Geological Survey, this inelasticity is because around half the world's moly - and around three-quarters of western world supply - is mined as a by-product of copper. Only in China is moly mined extensively as a primary mineral, and accidents at mines there are another reason for the spike in prices.
Its main benefit to copper miners was that separating and selling moly reduced the net cash cost of mining the copper - spectacularly so in recent times. During the first half, soaring moly prices meant cash copper-mining costs at Antofagasta's giant Los Pelambres mine were actually negative. Indeed, the company could have let the copper pile up unsold and still made cash profits of 48 cents on each 1lb! "
________________________________
All in all things are very positive in this area, and with EKA on for Q1 06 with Moly, be prepared for a large rise, either before year end or just after, it should not be staying this cheap much longer.
tallsiii
- 28 Nov 2005 16:02
- 128 of 215
If EKA don't delay their production (as they have done before), then their price should definately see a very large spike up over the next 6-12 months. Hang on in there, but it could be a choppy ride.
PapalPower
- 29 Nov 2005 06:26
- 129 of 215
PapalPower
- 29 Nov 2005 06:28
- 130 of 215
PapalPower
- 03 Dec 2005 16:21
- 131 of 215
MARKET TALK:
Thu Dec 1, 2005 9:42 AM GMT
Link
UBS RAISES MINER PRICE TARGETS
Investment bank UBS raised its share price targets and earnings per share estimates on several UK-listed mining firms on Thursday, following upgrades to its copper, gold and molybdenum price forecasts.
"Strong Chinese demand combined with the declining quality of ore reserves should underpin copper prices. Strong jewellery demand and further growth in investment demand should boost the gold price in 2006," UBS said in a research note.