ateeq180
- 21 Apr 2006 11:06
Has any one noticed this this morning a lot of buying with just one sell Ttrade,any one think this could be a good punt,advice please before its too late.thanks.
watcher
- 01 Oct 2010 15:26
- 214 of 436
so glad i held on...long way to go before it hits 5p.......unless the RNS supports the spike
GLA
Balerboy
- 01 Oct 2010 16:00
- 215 of 436
couldn't agree more.,.
Master RSI
- 01 Oct 2010 16:04
- 216 of 436
Share price consolidating after the UPS and downs since the BREAKOUT
Could be news soon of the A12 back on stream after workover
Master RSI
- 08 Oct 2010 10:28
- 217 of 436
From the "UPS" thread earlier this morning...........
MTA 1.90 / 1.95p - 0.075p
Reason: The "keep an EYE" share has now had a retracement of 61.8% from its intraday high of 2.825p, this is an important strong point for the bounce back as is support at the same time.
Strong level 2 now of 4 v 1, and sells are given a premium 1.92p
CHARTS - 5 DAYS 1 MONTH

Master RSI
- 08 Oct 2010 10:34
- 218 of 436
The chart on Fibonacci points done last Tuesday 5th, as I was expecting this to happen .....
mitzy
- 25 Oct 2010 08:24
- 219 of 436
Top loser this am.
Balerboy
- 25 Oct 2010 08:26
- 220 of 436
Competent Person's Report ("CPR")
Matra Petroleum, the Russian focused E&P Company, is pleased to report that Energy Resource Consultants ("ERC") has completed a CPR on the Sokolovskoe Field. The CPR is based on the results of the in-depth geophysical and geological review conducted by Equipoise Solutions.
The main results are as follows:
Contingent Recoverable Resources (2C) 15.1 million barrels1
Net Present Value $60-80 million for 15 million barrels2
Deterministic Recoverable Resources as currently mapped - 23.7
million barrels3
Unrisked additional Prospective Recoverable Resource of up to
84 million barrels (high case)
1. Under SPE guidelines these estimates will be reclassified as Recoverable Reserves once the "Contingencies" are satisfied. The contingencies are the formal issue of the Production Licence, the adoption by the Board of Matra and acceptance by appropriate authorities of a Field Development Plan.
2. Net Present Value using 10% discount rate and $75/barrel for Urals blend export price. (ERC verification/audit of Matra model)
3. Estimate is based on the structure as currently mapped by Equipoise Solutions but cannot currently be included in SPE classifications due to structural uncertainty and lack of well data in the NE part of the field.
The covering letter from ERC and definitions are shown below.
Operational Update
Well-12
Attempts to establish a circulation path between the oil and water zones that would allow cement isolation in well 12 have been unsuccessful. Following a technical review we concluded that further attempts to isolate water in well-12 are unlikely to be successful and therefore the well will be sidetracked some 50 meters from the existing bottom hole location where drilling will be halted within the oil zone (without penetrating water bearing formations) and then recompleted for production.
A contract for this side-track is currently being finalised and the rig will be mobilised to the site within the next few days. This will be funded from existing cash resources and is estimated to take four to six weeks.
Well-13
Due to contractual commitments of the workover rig from well-12 a rig has been separately sourced to conduct the remedial work on well-13. This rig is currently being mobilised to the site and the work is expected to take 2-3 weeks.
The nature of the water influx in well-13 differs from that in well-12 and therefore cement isolation is technically more feasible.
Matra's Managing Director, Peter Hind said:
"We are delighted with the results from the CPR which endorse our strategy to monetise the Sokolovskoe Field. The work conducted by Equipoise has also resolved the technical issues thrown up by the well-13 result. The geological review concluded that we have yet to encounter the best part of the reservoir and that the main reefs are most likely very close to existing wells and the possibility remains that reserves will ultimately be much higher.
Given the unexpected result of well-13, we will need to confirm the North Eastern part of the structure with more seismic and additional wells to move that area into the Contingent Recoverable Resources category. The economic review concludes that the development is extremely robust commercially and that additional reserves will add substantial value in the future.
In well-12 we reached the conclusion that it would be better to side-track the well away from the existing location. This is likely to provide a much more satisfactory result.
We are not aware of any impediments to the issue of the Production Licence and expect confirmation of this before year-end, allowing us to move reserves into the proven and probable category and to begin field development in earnest."
mitzy
- 15 Nov 2010 09:32
- 221 of 436
Top performer this morning.
mitzy
- 15 Nov 2010 12:45
- 222 of 436
This could go all the way.
Balerboy
- 15 Nov 2010 13:52
- 223 of 436
whats happened to your matd.....was getting me all excited last week......Nice to see this one taking off.,.
driver
- 16 Nov 2010 12:54
- 224 of 436
kuzemko
- 16 Nov 2010 13:53
- 225 of 436
yep,
despite the news, still lot of buying today and last few days??????
driver
- 14 Dec 2010 13:12
- 227 of 436
Matra Petroleum mobilises rig for well-12
StockMarketWire.com
Matra Petroleum says that a rig has been contracted to undertake side-tracking operations on well-12 and mobilisation to the site has begun.
Remedial cementing operations have now been completed on well-13. After a short flow period to ascertain if the water has been successfully isolated, the well will be shut-in while surface production equipment is installed before restarting production.
MD Peter Hind adds: "The remedial cementing on well-13 appears to have gone well. We will know if we have successfully isolated the water zone once production is started.
"We are pleased to be starting work on the well -12 side-track which will be supervised by Fosco, a highly experienced Russian contractor."
Operational Update
http://moneyam.uk-wire.com/cgi-bin/articles/201012140700068658X.html
mitzy
- 23 Dec 2010 07:59
- 228 of 436
RNS.
Balerboy
- 23 Dec 2010 08:00
- 229 of 436
I think it's worth a YES!!! as well
mitzy
- 23 Dec 2010 08:02
- 230 of 436
Yes...!