the following is paraphrased from Shares Mag - 5/11/09 page 38
http://www.londonmining.co.uk
LOND joined AIM on 6/11/09 and already holds $230m cash.
That said, its future projects will require serious swathes of further cash, even with relevant gov'ts putting hands in their own pockets.
Sierra Leone will be first project to come on stream in mid/late 2011, all being well ..... Expect regular updates during 2010
Saudi feasibility study expected by end 2009, but likely to be another very significant project ..... funding will be required (about $1bn), but targetted to start production in 2013
Greenland has the largest prospective asset, with production scheduled for 2014 ..... difficulty here will be the extreme weather conditions as deposit is close to Arctic Circle
China - although the CEO reckons this as the true prize (blending several small sites into one), this is all very much up in the air at time of writing.