Sharesmagazine
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Share Price   Awards   Market Scan   Videos   Broker Notes   Director Deals   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Indices   Forward Diary   Forex Prices   Shares Magazine   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Comparison Tables   Spread Betting 
You are NOT currently logged in
 
Register now or login to post to this thread.

88 Energy (88E)     

dreamcatcher - 03 Feb 2012 08:36



88 Energy Limited (formerly Tangiers Petroleum Limited) is an ASX listed exploration exploration company that has recently announced the acquisition of a new, potentially world class oil asset located in Alaska. It also has a 25% stake in the Tarfaya Offshore Block is located on the Moroccan Atlantic margin and was acquired by the company in 2009.

Alaska-project-icewine

morocco

http://88energy.com/

Chart.aspx?Provider=EODIntra&Code=88E&SiChart.aspx?Provider=EODIntra&Code=88E&Si

HARRYCAT - 04 Jul 2017 10:15 - 438 of 494

StockMarketWire.com
88 Energy said stimulation fluid continued to flowback naturally at Icewine#2 onshore North Slope of Alaska with ~15.3% of total stimulation fluid recovered to date.

It said a recent increase in salinity of the recovered fluid possibly indicated that some in-situ reservoir fluid was starting to flowback.

88 Energy said the forward plan remained unchanged and might include shut in for pressure build-up and soak and/or artificial lift to increase the rate of stimulation fluid recovery.

kimoldfield - 04 Jul 2017 10:19 - 439 of 494

It was not as gloomy as I was led to believe. At least Dave Wall is being honest about progress. I am not an expert in this sort of oil play so cannot work out if all is really well or if a little more uncertainty has crept in.

kimoldfield - 10 Jul 2017 00:24 - 440 of 494

Hmmm.

10 July 2017
88 Energy Limited Icewine#2 Operations Update
88 Energy Limited (“88 Energy”, “the Company”, “Operator”) (ASX, AIM: 88E) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska.
Highlights
• Stimulation fluid has continued to flowback naturally
• ~16% of total stimulation fluid recovered to date
• Shut in planned for 6 weeks
Icewine#2 Operations Update
Flowback operations have continued, with fluid composition comprising 100% water. After analysing the performance of the well to date, and comparing to results from other plays, a decision has been made to shut the well in for six weeks to allow for pressure build up and imbibition to occur. Imbibition (or soaking) has proven to be effective in other plays by allowing frac fluid to be absorbed, displacing in-situ water that may be blocking hydrocarbon molecules from being able to flow through the reservoir.
Post the shut in period, the well may then be swabbed.
Further analyses are required to determine the impact, if any, of the performance of the Icewine#2 well on the probability of success for the HRZ play at the Franklin Bluffs location and over the wider acreage position.
Further updates will be made as and when appropriate throughout the testing program.

Yours faithfully
Dave Wall Managing Director 88 Energy Ltd

deltazero - 10 Jul 2017 17:05 - 441 of 494

trading patterns today set up for a bounce tomorrow imo

2 to 2.3p range imo
atb

deltazero - 10 Jul 2017 17:23 - 442 of 494

http://88ewiki.wikidot.com/icewine-2

deltazero - 10 Jul 2017 18:01 - 443 of 494

fyi
"Funds raised under the Placement further strengthen the Company's balance sheet ahead of the upcoming drilling of the Icewine#2 well. Specifically, the proceeds will provide the Company with the financial flexibility to cover any unexpected costs arising from the drilling of Icewine#2, lease payments due in respect of the significant new acreage awarded and ongoing exploration activities."

deltazero - 11 Jul 2017 13:20 - 444 of 494

blue :-)

onward and upwards

YES SIREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE!!

gla

driver - 11 Jul 2017 18:44 - 445 of 494

Didn't sell, so added a few on the dip.

deltazero - 12 Jul 2017 08:27 - 446 of 494

morning driver - good stuff - you know it makes sense :-)
2p gone as expected and the day is young
atb

driver - 12 Jul 2017 22:20 - 447 of 494

Still under here AV 2.6 but going in the right direction.

kimoldfield - 18 Jul 2017 07:55 - 448 of 494

RNS Number : 2196L
88 Energy Limited
18 July 2017

18 July 2017

88 Energy Limited

Icewine#2 Operations Update

88 Energy Limited ("88 Energy", "the Company", "Operator") (ASX, AIM: 88E) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska.
Highlights
· Icewine#2 well shut-in on 10th July to allow for imbibition and pressure build-up
· Analyses of flowback results to date ongoing

Icewine#2 Operations Update

The Icewine#2 well was shut-in on the 10th July for a six week period to allow for imbibition and pressure build up to occur. Prior to shut-in, 16% of the stimulation fluid had been recovered from the reservoir under natural flowback, with trace hydrocarbons returned at surface.

Imbibition, or "soaking", allows for absorption of frac water into the formation, which may displace reservoir water molecules that are restricting hydrocarbon molecules from flowing into the created fractures. The pressure build up data will provide insights into the permeability created by the stimulation. Ultimately, the post shut-in well performance will determine the next steps required, such as continuing to flowback naturally or the introduction of artificial lift (eg swabbing).

The HRZ shale shares several characteristics with other successful shales in the Lower 48; however, there is no blueprint or benchmark against which it is meaningful to measure performance as there are also many differences. At this juncture, the Joint Venture is of the view that further analyses are required to determine what impact the performance of the well to date has on the probability of success for the play. These analyses include, but are not limited to;
· comparison of the flowback rate against expected the expected flowback rate based on reservoir parameters and the successful execution of the fracture stimulation;
· reconciliation of the petrophysical model, and the apparent in-situ hydrocarbons, with the hydrocarbons recovered to surface to date.

These analyses are ongoing and will be communicated once complete.

Further updates will be made as and when appropriate throughout the testing program.

Media and Investor Relations:

88 Energy Ltd
Dave Wall, Managing Director Tel: +61 8 9485 0990
Email: admin@88energy.com

Finlay Thomson, Investor Relations Tel: +44 7976 248471

Hartleys Ltd
Dale Bryan Tel: + 61 8 9268 2829

Cenkos Securities Tel: + 44 131 220 6939
Neil McDonald/Derrick Lee

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Mr Brent Villemarette, who is a Non-Executive Director of the Company. Mr Villemarette has more than 30 years' experience in the petroleum industry, is a member of the Society of Petroleum Engineers, and a qualified Reservoir Engineer who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Mr Villemarette has reviewed the information and supporting documentation referred to in this announcement and considers the prospective resource estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

Project Icewine Overview
In November 2014, the Company entered into a binding agreement with Burgundy Xploration (BEX) to acquire a significant working interest (87.5%, reducing to 77.5% on spud of the first well on the project) in a large acreage position on a multiple objective, liquids rich exploration opportunity onshore Alaska, North America, referred to as Project Icewine. In June 2016, the gross acreage position was expanded to 271,119 contiguous acres (210,250 acres net to the Company). In December 2016 the Company successfully bid on additional acres. On award the Project Icewine gross acreage position will be further expanded to ~690,000 contiguous acres (~400,000 acres net to the Company assuming all rights are taken up).

The Project is located on an all year operational access road with both conventional and unconventional oil potential. The primary term for the State leases is 10 years with no mandatory relinquishment and a low 16.5% royalty.

The HRZ liquids-rich resource play has been successfully evaluated based on core obtained in the recently completed (December 2015) Icewine #1 exploration well, marking the completion of Phase I of Project Icewine. Phase II has now commenced, with drilling at the follow-up appraisal well, Icewine#2, commencing early 2Q2017. Production testing is ongoing.

Significant conventional prospectivity has also been identified on recently acquired 2D seismic across the project acreage.

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

Generous exploration incentives are provided by the State of Alaska with up to 35% of net operating loss refundable in cash.

The primary objective is an untested, unconventional liquids-rich shale play in a prolific source rock, the HRZ shale (Brookian Sequence), that co-sourced the largest oil field in North America; the giant Prudhoe Bay Oil Field Complex. Internal modelling and analysis indicates that Project Icewine is located in a high liquids vapour phase sweetspot analogous to those encountered in other Tier 1 shale plays e.g. the Eagle Ford, Texas.

Recently acquired 2D seismic has identified large conventional leads at Project Icewine within the same Brookian petroleum system and shallow to the HRZ shale, including potential high porosity channel and turbiditic sands associated with slope apron and deepwater fan plays. The Brookian conventional play is proven on the North Slope; the USGS (2013) estimated the remaining oil potential to be 2.1 billion barrels within the Brookian sequence. Two recent discoveries in the Brookian have already exceeded these estimates, with Armstrong/Repsol discovering 1.4 billion barrels in 2015 and Caelus announcing a 2.5 billion barrel discovery in 2016. Additional conventional potential exists in the Brookian delta topset play, deeper Kuparuk sands and the Ivishak Formation.

A Prospective Resources Report by DeGolyer and MacNaughton, was commissioned by 88 Energy to evaluate the unconventional resource potential of Project Icewine in February 2016 and was released to the market on 6th April 2016.

About 88 Energy: 88 Energy has a 77.5% working interest and operatorship in ~271,000 acres onshore the prolific North Slope of Alaska ("Project Icewine"). Gross contiguous acreage position will expand on award of additional leases successfully bid on in the December 2016 State of Alaska North Slope Licensing Round. The North Slope is the host to the 15 billion barrel Prudhoe Bay oilfield complex, the largest conventional oil pool in North America. The Company, with its Joint Venture partner Burgundy Xploration, has identified highly prospective play types that are likely to exist on the Project Icewine acreage - two conventional and one unconventional. The large unconventional resource potential of Project Icewine was independently verified by leading international petroleum resource consultant DeGolyer and MacNaughton. In addition to the interpreted high prospectivity, the project is strategically located on a year-round operational access road and only 35 miles south of Pump Station 1 where Prudhoe Bay feeds into the Trans Alaska Pipeline System. The Company acquired 2D seismic in early 2016 to take advantage of the globally unique fiscal system in Alaska, which allowed for up to 75% of 1H2016 exploration expenditure to be rebated in cash. Results from the seismic mapping and prospectivity review are encouraging, and form the basis of a conventional prospectivity portfolio for Project Icewine. In late 2015, the Company completed its maiden well at the project, Icewine#1, to evaluate an unconventional source rock reservoir play which yielded excellent results from analysis of core obtained from the HRZ shale. The follow-up well with a multi-stage stimulation and test of the HRZ shale, Icewine#2, spud in early 2Q2017.


This information is provided by RNS
The company news service from the London Stock Exchange

END

driver - 18 Jul 2017 08:56 - 449 of 494

Out at .18 backed topped up bLU

HARRYCAT - 19 Jul 2017 09:56 - 450 of 494

StockMarketWire.com
88 Energy has issued a report on activities for the quarter ended 30 June with the highlight being the spud of Icewine#2 production test well which occurred on 24 April, with the following key project milestones:

- The Arctic Fox drilling rig reached a Total Depth of 11,450' on 15 May , on schedule and without incident

- Wireline logging successfully completed throughout the production interval

- Stage 1 and Stage 2 stimulation operations completed successfully, with over 98% of the intended proppant volume placed in the HRZ reservoir

- Flowback commenced on 19 June with ~16% of stimulation fluid recovered prior to shut in on 10 July, with trace hydrocarbons encountered during flowback

- Drilling and production testing expenditure anticipated to be within budget

The company said the well was shut in on 10 July for an anticipated period of 6 weeks to allow for pressure build up and imbibition to occur.

The company said that at the end of the quarter, it had cash reserves of A$31.6m, including cash balances held in joint venture bank accounts.

mentor - 20 Jul 2017 11:07 - 451 of 494

up to 2.025p +0.45p

Someone at Twitter - mentioned a rumour that the oil is flowing ??


would think its too early ?? for 6 weeks to wait

Rumor alright got plenty in and now SOMEONE on the way out

HARRYCAT - 04 Aug 2017 11:31 - 452 of 494

Interim Report
88 Energy Limited is pleased to announce its interim results for the half year ended 30 June 2017.

A copy of the Company's Interim Report, extracts from which are set out below, has been lodged on the ASX and is also available on the Company's website at www.88energy.com and at the link at the foot of this announcement.

OPERATING AND FINANCIAL REVIEW

During the period, the Group has continued its principal activities in Alaska. A summary of significant activities is below:

Highlights for the first half of 2017:

· Conventional prospectivity review completed in the half year identifying resource potential in conventional leads, based on internal estimates totalling;
o 1.5 billion barrels of gross mean Prospective Resources (unrisked)
o 1.1 billion barrels of net mean Prospective Resources to 88 Energy (unrisked)
· Spud of Icewine#2 Production Test well to evaluate the HRZ shale play occurred on 24th April 2017, with the following key project milestones;
o Rig contract with Doyon Drilling Inc. for the Artic Fox rig executed in February 2017, with the rig mobilising to site in March 2017;
o Icewine#2 Permit to Drill approved in April 2017, with spud occurring shortly thereafter;
o The Arctic Fox drilling rig reached a Total Depth of 11,450' MD on 15th May 2017, on schedule and without incident;
o Wireline logging successfully completed throughout the production interval;
o Stage 1 and Stage 2 stimulation operations completed successfully, with over 98% of the intended proppant volume placed in the HRZ reservoir;
o Flowback commenced on 19th June 2017 from Stage 2 (upper zone) with 8% of total stimulation fluid recovered,
o Rate and pressure observations indicated that the upper zone was likely in communication with Stage 1 (lower zone) consequently the plug separating the two zones was drilled out
o ~16% of the stimulation fluid was recovered from the combined zones prior to shut in on 10th July 2017, with trace hydrocarbons encountered during flowback; and
o Drilling and production testing expenditure at Icewine#2 is anticipated to be within budget.
· Oversubscribed placement to domestic and international institutional and sophisticated investors raised A$ 17 million in the half year.

http://www.moneyam.com/action/news/showArticle?id=5615365

HARRYCAT - 17 Aug 2017 08:35 - 453 of 494

Project Icewine Operations Update
88 Energy Limited ("88 Energy", "the Company", "Operator") (ASX, AIM: 88E) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska.
Highlights
· Flow testing on Icewine#2 to re-commence week beginning 21st August post six week shut-in
· Gross acreage position increased by 76,996 acres (48,864 net to 88E)
o Total gross acres now 348,116 (259,114 net to 88E)
o Additional ~256,000 gross acres subject to award, expected later this year

Icewine#2 Operations Update
The Icewine#2 well was shut-in on 10th July for a six week period to allow for imbibition and pressure build up to occur within the HRZ shale. Flow testing is scheduled to re-commence week beginning 21st August.

Additional technical analyses are ongoing and will be communicated once complete.

Lease Position Expanded
The Project Icewine Joint Venture was awarded 109,817 gross acres on 7th July as part of a broader package of successful bids submitted in the December 2016 North Slope lease sale. Of these 109,817 gross acres, 76,996 gross acres (48,864 net to 88E) were recently taken up and paid for. Given the ongoing testing of Icewine#2, a decision was made to accept award on acreage where the coincidence of prospectivity for both the conventional and unconventional was greatest. An additional ~256,000 gross acres is subject to award, expected later this year.

HARRYCAT - 24 Aug 2017 09:02 - 454 of 494

StockMarketWire.com
88 Energy has confirmed that flow testing on Icewine#2 would re-commence in the week beginning 28 August post a six-week shut-in.

It said there had been a one week delay on resuming flow testing due to fine-tuning of testing procedure.

It said additional technical analyses were ongoing and would be communicated once complete.

HARRYCAT - 04 Sep 2017 08:10 - 455 of 494

Project Icewine Operations Update
88 Energy Limited ("88 Energy", "the Company", "Operator") (ASX, AIM: 88E) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska.
Highlights
· Flow testing on Icewine#2 re-commenced 31st August 10:26 (AK time) post ~7 week shut-in
· Currently flowing back naturally on 4/64 choke at ~70 barrels per day frac fluid
· Minor hydrocarbon indications via formation of gas hydrates within the choke manifold
· Pressure data analysis indicates limited connection to the reservoir prior to last 24 hours

Icewine#2 Operations Update
The Icewine#2 well was shut-in on 10th July to allow for imbibition and pressure build up to occur within the HRZ shale. Flow testing re-commenced on 31st August at 10:26 (AK time), and is ongoing. Results since flow testing recommenced are summarised below.

The Icewine#2 well is located on the North Slope of Alaska (ADL 392301). 88 Energy Ltd (via its wholly owned subsidiary, Accumulate Energy Alaska, Inc) has a 77.55% working interest in the well. The well was stimulated in two stages over a gross 128 foot vertical interval in the HRZ shale formation, from 10,957-11,085ft TVD, using a slickwater treatment comprising 27,837 barrels of fluid and 1,034,838 pounds of proppant.

The well was initially flowed back on a 6/64 inch choke and was reduced to a 4/64 inch choke after 26 hours to maintain pressure. Approximately 370 barrels of frac fluid had been recovered as at 1730 on 3rd September (AK time) at an average rate of 100 barrels per day. Hydrocarbon indications have been minor and are associated only with the formation of gas hydrates in the choke manifold. Methanol injection has been initiated to prevent the surface manifold equipment from freezing thereby ensuring free flow of produced fluids through the choke.

Wellhead pressure built to ~3,500psi during shut-in and has dropped to 1,130psi since flowback commenced. Initial analysis of the pressure data from both the build-up and flowback indicates limited connection to the reservoir prior to the last 24 hours. At 0550 on the 2nd September (AK time) a small pressure build-up was observed, potentially indicating the first contribution to pressure from the reservoir itself. This is the first time that this has occurred since flow testing was initiated, including the previous testing period prior to shut-in. To date the cumulative amount of stimulation fluid produced from both testing periods is 4,802 barrels, 17.25% of fluids injected.

The current flowback procedure is early stage and the significance of an implied pressure contribution from the reservoir and formation of gas hydrates cannot yet be determined.

T110Mikey - 06 Sep 2017 08:33 - 456 of 494

Anyone subscribing to the MoneyAM Level 2 platform please take note that most days it is not reporting the correct Trade High nor Trade Low information and "some days" not reporting the correct Opening Price or Closing Price.

The reason is because MoneyAM's Level 2 system is not correctly sensing the Auto Trades or Ordinary Trades correctly so is wrongly reporting them

T110Mikey - 06 Sep 2017 09:00 - 457 of 494

Anyone subscribing to the MoneyAM Level 2 platform please take note that most days it is not reporting the correct Trade High nor Trade Low information and "some days" not reporting the correct Opening Price or Closing Price.

The reason is because MoneyAM's Level 2 system is not sensing the Auto Trades or Ordinary Trades correctly so is wrongly reporting them

MoneyAM has been unable to fix the fault for over 8 weeks now but are still charging full price for their Level 2
Register now or login to post to this thread.