m0neyb0b
- 26 Nov 2004 07:30
Just cannot understand recent SP volatility!
As a Dana shareholder I find it difficult to
find any reason to sell, even at current price. The Company has recently
entered a number of agreements which will have
considerable benefits:-
1. Reserves from 31st December 2003 of 123.7 mmboe
must now be in the region of 200.0 mmboe.( 100 million
North Sea 70 million Mauritana 30 million Russia ).
2. Production will rise to 25-27 thousand boepd in
2005 from 18 thousand in 2004.
3. At 30th June 2004 a Net cash position which will
have been enhanced significantly year to date.
4. Exciting exploration potential.
5. Management that seem to know what they are doing
with an excellent chief executive.
6. Recent deals by other oil companies have seen oil
assets bought at prices between 7-11 dollars a barrel
( see last weeks Investors Chronicle ) Dana must have
a value well in excess of the current 300 million.
I am holding firm and looking towards 800 pence.
Any other views out there?
lanayel
- 14 Jul 2006 13:45
- 213 of 659
Thank you Sir
;o)
Fundamentalist
- 31 Jul 2006 13:57
- 214 of 659
Dana Petroleum says remains on track to meet 2007 target of 40,000 boepd
AFX
LONDON (AFX) - Dana Petroleum PLC reiterated that it remains on track to achieve its target of producing 40,000 barrels of oil equivalent per day (boepd) by the end of 2007.
'Dana should continue to benefit strongly from this growth in production during 2006 and 2007 as the company is currently completely un-hedged with respect to oil price,' chairman Colin Goodall said at today's annual general meeting.
Production reached a record 19,683 boepd in 2005
Fundamentalist
- 31 Jul 2006 13:57
- 215 of 659
Dana Petroleum PLC
31 July 2006
Monday 31 July 2006
PRESS RELEASE
DANA PETROLEUM plc ('Dana', 'the Company' or 'the Group')
ANNUAL GENERAL MEETING STATEMENT
Dana Petroleum is pleased to report that at its Annual General Meeting held
earlier today all resolutions were approved by shareholders.
Commenting on the progress and activities of the Company, Chairman Colin Goodall
released the following statement:
'Dana delivered exceptional performance in 2005, continuing its strong track
record of year-on-year growth. By achieving a new high in oil and gas
production, coupled with a number of astute commercial deals, this led to a
record financial performance for the Company with net profit increasing by over
400%.
The Group completed the year in a very healthy position, with significant cash
reserves, excellent cash flow and a portfolio of high quality growth
opportunities. Dana thus began 2006 poised ready to double its production levels
from less than 20,000 boepd to 40,000 boepd over the ensuing 2 year period to
end 2007, through unprecedented levels of development activity in the North Sea.
The first 3 of these new field developments, Goosander, Cavendish and Enoch are
progressing well and due to come on stream over the next 6 months. Dana is thus
on track to achieve its target of producing 40,000 boepd by the end of 2007.
Thus far during 2006, Dana has continued its high pace of operational activity
in each of the Group's core areas. Major achievements already this year have
included two new oil and gas discoveries in the North Sea, one in the UK and one
in the Netherlands. Both of these are currently being flow tested and the final
results will be reported shortly. In addition to the ongoing new North Sea field
developments, a range of work is being undertaken offshore to enhance the long
term performance and value of the Company's existing producing assets, including
infill drilling, increased water injection and facilities upgrades.
Dana should continue to benefit strongly from this growth in production during
2006 and 2007 as the Company is currently completely un-hedged with respect to
oil price.
North Sea Operational Update
1. Southern North Sea Gas Fields
The Cavendish field development is on schedule for first gas by end 2006. The
platform was installed in June and the drilling rig is due to arrive in August
following completion of drilling at the F16-E gas field in The Netherlands, in
which Dana also has an interest.
A key appraisal well is in progress to appraise the Babbage gas field, which has
the potential to contain up to 390 billion cubic feet of gas-in-place in Permian
age Rotliegend sandstone reservoir. The well is targeting a crestal area of the
reservoir in order to establish reservoir productivity ahead of a development
decision. If appraisal is successful, it is expected the field will be moved
quickly into development as a tie-back to existing infrastructure.
In the Netherlands, the E18-DF exploration well has reached total depth,
discovering good quality gas bearing sands and is currently being flow tested.
This discovery has encouraged the potential drilling of an appraisal well in a
fault block to the west of the current well to prove further volumes before
developing the fields as a tie-back to the F16-E platform. Two additional wells
have been drilled, as planned, on the F16-E gas field since production started
in late 2005.
2. Central & Northern North Sea Oil Fields
2006 is seeing major progress across the Greater Kittiwake Area ('GKA') with
both the Gadwall water injection well and the Goosander oil production well
already completed. Goosander will deliver first oil imminently. Good production
performance from the GKA during the first half of 2006 was partially offset by a
drilling rig anchor collision incident involving the Gadwall/Mallard pipeline.
This led to both fields being shut-in for a period of several weeks. A permanent
solution was completed in July and production from the Gadwall/Mallard pipeline
has been reinstated. Dana's net production from the Kittiwake, Mallard and
Gadwall fields is currently around 8,000 to 9,000 boepd and this could rise to
13,000 to 14,000 boepd when Goosander comes on stream.
Dana's overall production is significantly influenced by the ongoing field
development activities at GKA as the Company holds a 50% interest in these
fields. Group daily production is currently around 24,000 boepd, which is more
than a 20% increase from the 2005 annual average production of 19,683 boepd. As
previously reported, average production for 2006 as a whole will be highly
sensitive to the timing of the three new field start-ups. Two of these,
Cavendish and Enoch, will begin flowing around the year end. It is currently
estimated that Dana will exit 2006 with production levels of over 33,000 boepd,
with the average for the year in the range 24,000 to 27,000 boepd. Production
will be biased to the second half as new fields are being added. These figures
can only be rough estimates at this time and a forecast to year end will be
given at the Company's Interim Results in September. By that time the early
performance of the Goosander field and the reinstated Mallard and Gadwall fields
will be known, as well as the completion date for the Gaz de France transaction
which will add new producing interests into the Dana portfolio from the Anglia
and Johnston gas fields.
Numerous opportunities have been identified to further increase oil production
and reserves at GKA. Currently, a sidetrack of the original Mallard water
injection well is being drilled to increase reservoir sweep efficiency and hence
recoverable oil reserves. Development plans are also being progressed for the
Grouse discovery, to the east of Kittiwake, and the redevelopment of the Durward
and Dauntless oil fields to the west of Goosander. Dana has concluded a deal
with Venture to enter Block 21/20a (outside the Cook field area) and Block 21/
20b, which includes the Christian oil field and the Bligh gas condensate
discovery. The Christian partners, which are currently Dana, Venture and Noble,
are considering plans to tie the field across the Mallard and Kittiwake
infrastructure. The relatively fixed operating costs on the Kittiwake host
platform mean that any incremental oil produced in the GKA is highly profitable.
The Enoch field development is broadly on schedule with first oil currently
expected to flow around the end of 2006. The drilling rig is due to arrive by
September and the topsides work on the host Brae platform is already underway.
Infill drilling at the Claymore field continues to maintain production levels,
extend field life and increase oil reserves. In addition, planning has started
to drill a further well on the Banff field in Q1 2007 and gas compression
upgrades have begun on the FPSO.
The Causeway exploration well, now drilling in Block 211/23d, has effectively
tested two prospects. It has discovered additional oil in the Brent reservoir
both in proximity to the existing 211/23d-2 discovery and in the previously
undrilled A-prospect. A flow testing programme is currently being undertaken.
Dana, as operator of the adjacent 211/22a block, has begun subsurface studies to
identify development opportunities, either on the existing undeveloped
discoveries, or in new fault blocks. Given the close proximity to existing
infrastructure, the Causeway discovery and further targets identified by Dana,
give increasing confidence in being able to deliver a valuable development
opportunity in this area.
International Exploration Update
Dana will use the Atwood Hunter rig for two wells offshore Mauritania beginning
in August. The first is targeting the Flamant prospect in Block 8, which is a
very large carbonate structure in this under-explored area of Northern
Mauritania. After Flamant the rig will move to the Aigrette prospect in Block 7.
Aigrette is a structural closure some 40 km to the north of the Pelican
discovery made by Dana with its first well in Block 7. The Aigrette well is
targeting similar age sands to Pelican.
After entering Egypt in 2005, Dana is rapidly building a valuable portfolio of
licences in country. A 3D seismic survey at the South Feiran Concession in the
Gulf of Suez was successfully completed in Q2 2006. Seismic processing is
underway and interpretation of this data should define exploration targets for
drilling from 2007.
Offshore Kenya, the Chikyu deepwater drillship has been contracted by the
joint-venture operator Woodside to enable two wells to be drilled to test the
huge Sokwe and Pomboo Cretaceous age structures. Drilling is currently planned
for late 2006 or early 2007.
Whilst the Chikyu drillship is available, Woodside and Dana intend to bring
forward the drilling of a first well for the group in the Great Australian
Bight, offshore South Australia, in late 2006 or early 2007. The precise timing
of the drilling in Australia and Kenya will depend on the combined partnerships'
view of the weather windows at the two locations.
Offshore Morocco, 3D seismic has been accelerated over the North-West Safi
exploration licence. The survey, which is already complete, should define
drilling targets on a number of prospects identified from earlier 2D seismic,
with a view to commencing drilling by late 2007.
Outlook
Dana is on track to grow significantly over 2006 and 2007. The Company's sound
strategy has led to both strength and balance being developed within its
portfolio and this is now delivering tangible benefits with rising production
capacity and a 40 well exploration and appraisal drilling programme running from
2006 through 2008 targeting potential reserves of over 2 billion barrels net to
Dana. The Company's good working relationships with its co-venturers, major oil
and gas companies and governments have led to valuable cooperation across
different areas. One example of this has been the securing of drilling rigs for
deepwater wells in Mauritania, Kenya and Australia.
The strategic Exchange Agreement previously announced with Gaz de France ('GdF')
is nearing legal completion. The multi-country, multi-asset nature of this
transaction has meant that achieving the various governmental and third party
approvals is, as expected, taking some time. However, approval has now been
received from the DTI in the UK and the Government of Mauritania, and both GdF
and Dana are working to expedite approval in Egypt and obtain third party
consents. Dana has also reached agreement with GdF regarding the other assets to
be included within this transaction and an announcement will be made detailing
these associated assets in the near future.
It is particularly pleasing to report the faster than expected pace of licence
acquisition and seismic acquisition offshore Morocco and Egypt. It is already
clear that these two new business areas should deliver numerous quality drilling
opportunities for Dana in the medium term, starting as early as 2007.
The next year will be an exciting period for Dana, with results from a range of
important exploration wells internationally and the commissioning of new
producing fields in the UK which will ensure the Company's continued strong
growth.'
Fundamentalist
- 31 Jul 2006 14:36
- 216 of 659
All sounds positive and as expected a fair bit of news flow expected in the second half.
Good to hear the Gaz de France deal is nearing completion, all production still unhedged, Goosander production imminent.
Production expected to be 33K boepd by end of 2006 and 40K by end of 2007 (which may even be on the conservative side imo). Financial yr 2006 production expected to be 24-27K boepd
Fundamentalist
- 08 Aug 2006 08:56
- 218 of 659
Start of the expected news flow today :-)
Mauritania: Exploration drilling update - Block 8
The Atwood Hunter drill rig was released by the operator Woodside on 5 August
2006 following the plugging and abandonment of the Colin-1 well and has been
relocated to Block 8, to drill the Flamant-1 exploration well. The well is
expected to spud by the end of this week.
Dana Petroleum PLC
08 August 2006
Tuesday 8th August 2006
PRESS RELEASE
DANA PETROLEUM plc ('Dana', 'the Company' or 'the Group')
First Oil Flows from the Goosander Field
Dana Petroleum is pleased to announce that production has successfully commenced
from the Goosander oil field, where the Company holds a 50% working interest.
Goosander is located in Block 21/12 within the Greater Kittiwake Area ('GKA') of
the UK Central North Sea, and is the fourth field to be produced in this area
joining the Kittiwake, Mallard and Gadwall oil fields.
Goosander has been developed as a subsea tie-back to the Kittiwake platform,
utilising two subsea flowline bundles totalling 12 kilometres in length. The
bundles were manufactured and installed by Subsea7 from their construction site
in Wick, Scotland and have been designed to accommodate future production and
water injection wells and the potential for re-use on future subsea tie-backs.
To effect the development, the original Goosander discovery well 21/12-3 has
been re-entered and completed as a production well and, subject to early field
production performance, the drilling of a water injection well is planned during
2007 to optimise oil recovery. Estimated gross proven and probable recoverable
reserves for the field are currently 15.2 million barrels of oil. The initial
production flow rates seen at Goosander are in line with expectations and, now
that Goosander is on stream, the overall productive capacity of the GKA is
approximately 28,000 barrels of oil equivalent per day.
Dana holds a 50% working interest in the Goosander field, and in the oil fields
of the GKA as a whole, alongside co-venturer and operator, Venture Production
plc. Dana's current productive capacity from the GKA is therefore now
approximately 14,000 barrels of oil equivalent per day.
Tom Cross, Chief Executive of Dana commented:
'Achieving first oil production from the Goosander field delivers Dana's most
important development target for 2006. The Group now produces from a total of 12
oil and gas fields, with 11 of these in the North Sea. Dana's production
portfolio is continuing to build with our next two UK developments, the Enoch
oil field and the Cavendish gas field, already in progress offshore.'
Fundamentalist
- 08 Aug 2006 09:01
- 219 of 659
Flamant going to be the next big bit of news - a bit of luck and a lot of oil please :-)
lanayel
- 08 Aug 2006 09:01
- 220 of 659
Superb news.
Share price motoring. I think Merrill Lynch had a short term target of 1350p - shouldn't take too long now !!!
Ian
Fundamentalist
- 08 Aug 2006 09:03
- 221 of 659
Morgan Stanley have initiated coverage with an overweight stance and a target price of 1560p
Flamant news will move the price heavily though more so if good news (as little is factored into the current price and its a free carry)
Fundamentalist
- 08 Aug 2006 13:30
- 222 of 659
broker comment helped to drive sentiment with Dana Petroleum up 95p at 1,315p, after the oil explorer was initiated as overweight by Morgan Stanley with a 1,560p target.
The US broker told clients that Dana is drilling for some 2.1 billion barrels of oil equivalent over the next three years that could increase its current asset base by 10 times and be worth up to around 4,100p per share.
compoundup
- 08 Aug 2006 17:12
- 223 of 659
Don't normally attach too much weight to broker notes but anywhere in a range from here to 4100p would be very nice, eh Steve?
Haven't seen the note so I don't know what (likely to be conservative) oil price the top figure is based on but right or wrong I intend to stay long for the ride. Has anyone mentioned the "unhedged" word here today?
Fundamentalist
- 08 Aug 2006 23:28
- 224 of 659
Always nice to here the word unhedged edward :-)
btw i think it was an additional 4100p so would be a sp of 5400p :-)) (but id take 4100p)
whatuwant
- 15 Aug 2006 09:02
- 225 of 659
Fundamentalist
- 15 Aug 2006 09:07
- 226 of 659
Dana Petroleum PLC
15 August 2006
Tuesday 15th August 2006
PRESS RELEASE
DANA PETROLEUM PLC ('Dana' or 'the Company')
Two New North Sea Discoveries Deliver Strong Oil & Gas Flows
Dana Petroleum is pleased to report the flow test results from its two latest
North Sea exploration wells, which have made important oil and gas discoveries
in the UK and Netherlands respectively. The Company's North Sea strategy
includes near term development projects which accelerate cash flow, complemented
by low risk exploration for oil and gas which can be brought into production
swiftly if successful.
In the UK Northern North Sea, flow test results from the East Causeway well 211/
23d-17z have proved extremely encouraging. The well was drilled horizontally
through the Middle Jurassic Brent Group of sandstones, intersecting several
reservoirs in the Ness and Tarbert Formations in two separate fault blocks. The
western fault block tested at a stabilised combined flow rate of 14,500 barrels
of oil per day (bopd) from the Ness and Tarbert formations.
The initial test on the Tarbert sands flowed high quality, light sweet crude oil
at stabilised rates of up to 7,000 bopd. The crude oil gravity is around 32
degrees API with a low gas oil ratio. A second test, performed on the Ness
Formation, flowed at stabilised rates of up to 7,500 bopd with the oil being of
similar high quality to that recovered from the first test. It is pleasing to
report that no water was produced during the tests from either zone.
The East Causeway well also intersected Brent sandstone intervals in the eastern
fault block, which had previously been drilled by the suspended well 211/23b-11
and flowed at rates of up to 8,100 bopd. Flow rate and pressure data from all
the reservoir tests will now be analysed to assess the full productivity and
reserve potential of both the neighbouring fault blocks. The East Causeway well
will be suspended for use as a potential future oil producer pending development
decisions, including the possible integration of this new discovery with other
existing oil discoveries in the area.
In the Dutch North Sea, the E18-6 well has also been successfully drilled and
flow tested. As predicted, a good quality reservoir interval was encountered in
the Lower Slochteren sands and this flowed at a rate of approximately 45 million
standard cubic feet of gas per day (mmscfpd). The gas discovered here was of
similar quality to that recently developed in the neighbouring F16-E gas field,
which was brought onstream in 2005 and in which Dana also holds an interest.
This latest discovery has encouraged the group to consider the drilling of an
appraisal well in a fault block further to the west of the current well. This
could prove up even more gas volumes before developing the area as a tie-back to
the F16-E platform.
Following the successes at East Causeway and E18-6, Dana is continuing its 2006
North Sea programme with appraisal drilling now underway on the Babbage gas
field in the UK Southern Basin. This Babbage well is targeting a crestal area of
the structure in order to establish reservoir productivity ahead of a
development decision. If appraisal is successful, it is expected the field will
be moved quickly into development as a tie-back to existing infrastructure.
Commenting on the news, Tom Cross, Dana's Chief Executive said:
'We are highly encouraged by the test results from the East Causeway and E18-6
wells and look forward to accelerating our technical work on these areas to
deliver potential new field developments. North Sea exploration is a key part of
Dana's strategy and these value-adding oil and gas discoveries in our core area
provide further growth opportunities as we seek to build upon Dana's current
portfolio of 12 producing fields.'
Fundamentalist
- 15 Aug 2006 09:08
- 227 of 659
Mauritania: exploration drilling update - Block 8
The Atwood Hunter drilling rig spudded the Flamant-1 well offshore Mauritania in
Block 8, at 1:15am on 11 August 2006. Over the last 48 hours a pilot hole has
been drilled to a total depth of 1,905 metres to check for shallow gas and
preparations are now underway to drill the main well bore.
Flamant-1 is targeting a large Cretaceous Carbonate platform/reef prospect in an
area of different geology to the rest of the offshore Mauritanian basin, which
holds significant potential, primarily for gas, and is recognised as the best
test of a large regional high with both primary and deeper secondary objectives.
Water depth at this location is approximately 1,400 metres.
Equities in Block 8 are:
Block 8
Dana Petroleum (Operator) 41.5%
Hardman Resources Ltd 18.0%
ROC Oil Company 2.0%
Wintershall 25%
Gaz de France 13.5%
Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hours
behind Western Standard Time, Perth.
Fundamentalist
- 15 Aug 2006 09:09
- 228 of 659
More good news flow this am though clearly the flamant results are going to be key to the SP in the short term
On all accounts Bridgewell downgraded DNX this am
Fundamentalist
- 15 Aug 2006 09:11
- 229 of 659
whatuwant
the 3 yr chart is even nicer :-)
whatuwant
- 15 Aug 2006 09:17
- 230 of 659
3 bagger - nice !!
Not holding myself but am looking for a solid O & G play......
Fundamentalist
- 15 Aug 2006 09:26
- 231 of 659
whatuwant
dnx has been core holding for me for quite a few years, most purchased at just above 200p with various top ups along the way
take a look at the fundamentals because they are very strong and there is a lot of drilling news due this second half of the year. Last yrs results (and this yrs interims) give good detail of the growth the company is undertaking.
these have always been a long term hold for me and will be for a few years at least i expect, mainly due to the balance they have between exploration and production and a solid management team. the current production side all but underpins the SP so most of the exploration is "in for free" currently, they also have the benefit of bieng completely unhedged on the oil price (so are getting full value for the recent price rises)
whatuwant
- 15 Aug 2006 09:35
- 232 of 659
Could you please give me a brief synopsis of the news due for the rest of 2006 and maybe the start of 2007.
I am researching DNX now but it is slow progress.
TIA.