nite ram
- 22 Sep 2006 13:12
Any experts out there with a view to todays RNS on Algerian gas find ?
Looks good to me but sp is down
Thanks in advance nr
HARRYCAT
- 21 Mar 2011 08:38
- 1055 of 1234
Petroceltic International plc is pleased to announce that it has completed logging and drilling of well AT-5 (pilot hole) on the Isarene permit in Algeria. Drilling began at the AT-5 well on 9th January 2011, and the well reached its total depth of 2049m on 2nd March 2011, having experienced drilling delays due mainly to surface equipment failures on the contracted drilling rig.
Well AT-5 is being drilled to test a major "pop-up" feature in the north of the field and is located approximately 4 km east of the AT-1 well. The "pop-up" feature is one of many such structures typical of the northern part of the field and it is anticipated that these features are associated with high natural fracture density and thus potentially enhanced un-stimulated gas productivity. Mud losses while drilling, together with core, conventional logs and image logs from AT-5 all indicate the interval is potentially highly fractured with some of these being open natural fractures.
Logs at AT-5 showed the objective Ordovician reservoir to be fully gas bearing, and a gross gas column of 75.5 metres was logged, with no gas water contact seen in the well. The overall hydrocarbon pore volumes encountered at this location were significantly in excess of the pre-drilling prognosis. The well was cored with 29 metres of core being recovered from the objective reservoir section.
After completion of coring, drilling, logging and borehole image logging of the near vertical AT-5 pilot well, the well has now been side-tracked as originally planned (AT-5Z) and a horizontal section of up to 500 metres is currently being drilled to explore for high natural fracture density associated with a series of tectonic faults. The faults have been interpreted from 3D seismic data and the horizontal well is oriented to intersect fractures which are expected to be open.
Andy
- 21 Mar 2011 16:51
- 1056 of 1234
Free event.
The directors of Petroceltic International (AIM: PCI), Ascent Resources (AIM: AST), Caza Oil & Gas (AIM, TSX: CAZA) and Providence Resources (AIM: PVR) will be presenting:Tuesday the 29th March 2011, The Shelbourne Hotel, 27 St Stephen's Green, Dublin, 2 Ireland
FREE registration - http://www.proactiveinvestors.co.uk/register/event_details/105
The presentations will start at 6:00pm and finish at approx 8:00pm. After the presentations are complete the directors will also be available to take questions during a free canapand wine reception. Details on the presenting companies can be found below.
This event is suitable for the following:
Sophisticated & private investors, private client brokers, fund managers, financial institutions, hedge funds, buy & sell side analysts and journalists.
The event is not suitable for people pursuing commercial opportunities.
If you have any problems registering or queries please email events@proactiveinvestors.com.
hermana
- 31 Mar 2011 14:40
- 1057 of 1234
Good evening was had too.
halifax
- 31 Mar 2011 16:30
- 1058 of 1234
all gas and gaiters?
hermana
- 01 Apr 2011 10:28
- 1059 of 1234
Aye and SP not reacting to Brian's hope and glory presentation yet.
HARRYCAT
- 04 Apr 2011 11:39
- 1060 of 1234
StockMarketWire.com
Petroceltic International plc reported a rise in pre-tax loss to $12.6m from $6.1m, mainly due to the write-off of exploration costs associated with its withdrawal from the Ksar Hadada permit in Tunisia.
Revenue for the year to December was $0.27m, up from $0.21m.
Exploration costs written off totalled $7.0m compared with the previous $1.3m.
The company ended the year with $82.2m in cash, previously $33.7m.
It raised $120.5m in April to fund the 2010 work programmes in Algeria and Italy and provide financial flexibility going into 2011.
In Italy, prior to the postponement of operations, the company raised over 70% of the funds needed to drill the Elsa-2 well through a 15% farm-out to Orca Exploration and a $14m investment agreement with Gemini Oil & Gas.
Chairman Robert Arnott said 2010 was a year of solid progress for Petroceltic despite challenging circumstances.
'The company has put in place the resources to exploit its world-class discovery in Algeria and the underlying strategy and investment case remains strong.
'The company is well positioned to add value within its existing business through an on-going exploration and appraisal programme, and is continuing to explore opportunities to expand its portfolio in areas that exploit the strengths of our team.'
hermana
- 06 Apr 2011 10:30
- 1061 of 1234
Exploring opportunities in Kurdistan and Tunisia?
HARRYCAT
- 06 Apr 2011 11:04
- 1062 of 1234
.
hermana
- 21 Apr 2011 14:44
- 1063 of 1234
Lots of 351 trades today? Pourqoi?
grevis2
- 28 Apr 2011 21:18
- 1064 of 1234
From UK-Analyst.com: Thursday 28th April 2011
Petroceltic International (PCI), the independent oil & gas exploration company focused on the Middle East, North Africa and Mediterranean region, has announced the sale of an 18% interest in an Algerian production sharing contract for a maximum 183 million dollars (110 million pound). The deal, which is subject to approval by Algerian state-owned energy company Sonatrach and the Algerian authorities, would value Petroceltic's Isarene production sharing agreement at between 800 million dollars and 1 billion dollars, the group added. The shares gained 2p to 12p
hermana
- 29 Apr 2011 12:32
- 1065 of 1234
PCI should rise again nicely on Tuesday once royal hyped day out and Mayday over.
grevis2
- 30 Apr 2011 09:53
- 1066 of 1234
From yesterday's Daily Mail ...
"More than 168m shares in Petroceltic International changed hands and the close was 2p better at 12p following a farm-out agreement of an Algerian asset with Italys ENEL Europes second largest electrical utility company.
The deal is worth up to 111m and ENEL has taken 18.375pc of the Isarene Block which includes the world class Ain Tsila gas condensate discovery."
ahoj
- 04 May 2011 10:35
- 1067 of 1234
How far can it get by October? 13p?
HARRYCAT
- 12 May 2011 15:32
- 1068 of 1234
StockMarketWire.com
Petroceltic International has completed drilling the Ain Tsila-5z well in Algeria.
The well completed drilling at a total depth of 2421 metres along hole, and has a horizontal section in the main Ordovician reservoir of 376.5 metres.
Good gas shows have been encountered throughout the reservoir section. The horizontal section will now be evaluated by drillpipe conveyed logging tools.
A multi-stage completion will be run on completion of the logging.
The company expects to suspend the well for testing by 24 May with test results expected in June.
At 3:29pm: (LON:PCI) Petroceltic International share price was +0.38p at 11.13p
HARRYCAT
- 17 May 2011 08:46
- 1069 of 1234
StockMarketWire.com
Petroceltic International, the upstream oil and gas exploration and production company focused on North Africa and the Mediterranean has announced the signing of a fully termed contract with KCA Deutag for a second drilling rig on the enlarged appraisal campaign on the Isarene Permit.
KCA Deutag's Nomad class drilling rig T-211 will work alongside the existing Dalma Rig LR-12 on the Ain Tsila Field appraisal programme.
Petroceltic has also announced that it has signed two contracts for studies in support of the Final Discovery Report. These are with G3Baxi Partnership Limited for field development conceptual studies and with Ove Arup and Partners for a geotechnical study. These studies will assist with initial concept selection and the location of the facilities, infrastructure and pipelines for the Final Discovery Report.
Brian O'Cathain, Chief Executive of Petroceltic commented: "The contract for the second rig will see a significant increase in the pace of appraisal activity on the Ain Tsila discovery following the recent successful fund raising and the farm out to ENEL. The award of contracts for the conceptual and geotechnical studies is of importance as they mark the start of the move from the exploration and appraisal phases of the production sharing contract into the pre-development phase."
HARRYCAT
- 30 May 2011 11:07
- 1070 of 1234
hermana
- 03 Jun 2011 16:36
- 1071 of 1234
Good finish today with AT-5 news next week.....
hermana
- 08 Jun 2011 15:04
- 1072 of 1234
Cant be much longer. AGM/EGM on Friday...
HARRYCAT
- 30 Jun 2011 16:16
- 1073 of 1234
"Cant be much longer.".................Hmmmmmm. I keep watching this stock and adding a few when cash available, but nothing substantial seems to happen. Back to 10p.......again.
HARRYCAT
- 12 Jul 2011 14:10
- 1074 of 1234
StockMarketWire.com
Petroceltic International in association with its partner Sonatrach, the Algerian National Oil & Gas Company, has issued an operational update on its Isarene permit (Blocks 228 & 229a) in the Illizi Basin in South Eastern Algeria.
Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds 18.375% interest, pending final Government of Algeria ratification, which is expected later this year.
At the AT-6 well the Ordovician reservoir was encountered as expected with good gas shows and a full suite of logs was run. Initial log interpretations indicate a gross Ordovician reservoir interval of 168m, and a net pay interval of 45m.
This confirms the extension of the field at this significant step-out from the previously drilled wells.
Testing is underway at the AT-5 well and a second rig has been mobilised to accelerate appraisal activities.
Drilling at the AT-7 and AT-8 wells is scheduled to begin this month.
Brian O'Cathain, Chief Executive of Petroceltic commented: "Initial results from the AT-6 well are very encouraging and increase the proven area of the Ain Tsila field considerably to the southeast with this large step-out.
"We are also extremely pleased that testing operations on AT-5 are underway. We are now entering a most exciting and busy period on our Isarene permit in Algeria with 2 rigs and a rig-less testing unit in operation. We look forward to announcing further well results by the end of July."