Sharesmagazine
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Share Price   Awards   Market Scan   Videos   Broker Notes   Director Deals   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Indices   Forward Diary   Forex Prices   Shares Magazine   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Comparison Tables   Spread Betting 
You are NOT currently logged in
Register now or login to post to this thread.

petroceltic (PCI)     

nite ram - 22 Sep 2006 13:12

Any experts out there with a view to todays RNS on Algerian gas find ?
Looks good to me but sp is down
Thanks in advance nr

niceonecyril - 16 Sep 2011 08:07 - 1098 of 1234

DMPCI

RNS Number : 3555O

Petroceltic International PLC

16 September 2011

Petroceltic International plc

Algeria Operational Update

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, today issues an update on operations at the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria. Petroceltic operates the permit with a 56.625 % interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending final Government of Algeria ratification.

-- AT-6 testing results

-- AT-8 and AT-9 operations update

AT-6 testing results

The AT-6 well, the third well in the current appraisal campaign on the Ain Tsila gas discovery, was drilled to a total depth of 2085m. The main objective of this well was to prove up Gas in Place in the south eastern extremity of the field outside the control of the 3D seismic area. This objective was successfully achieved, confirming the presence of the Ain Tsila gas column at this location and thus providing further evidence of the significant size of the in place gas resource on the structure. Testing operations commenced on 31(st) August and the well was suspended on 10(th) September.

A number of intervals in the objective Ordovician formation from 1952m to 1977m were perforated with one interval hydraulically fractured. The well was subsequently lifted with nitrogen to aid clean up however no flow was observed. The well was suspended for further analysis and possible future re-fracturing and the rigless testing unit has been mobilised to the AT-8 well location in the north of the field.

AT-8 operational update

The AT-8 well, a vertical well located in the north of the Ain Tsila field, is currently preparing to commence testing operations. The well reached a total depth of 2123m on 22 August 2011. It is located within the area of the 3D seismic data, 5km north east of the AT-1 well and 4.5km north west of the AT-5 well, in an undrilled section of the field. It was located to appraise a pop-up feature with a mapped fault system and to test the extent of the hydrocarbon column in the north of the field. Testing operations will commence on this well in the coming days once the rigless testing unit has remobilised from the AT-6 well location. The test programme will include hydraulic fracturing of the main reservoir interval, and results are anticipated in early October. After completion of the testing operations on the AT-8 well, the rigless testing unit will move to test the AT-7 well.

AT-9 operational update

Drilling on the AT-9 well with the KCA Deutag Rig T-211 commenced on 12(th) September. This well is the 6(th) well of the current Isarene licence appraisal campaign.

The AT-9 well is a horizontal appraisal well and is located towards the centre of the Ain Tsila field 4.3km north east of the AT-2 appraisal well and 7.8km south east of the AT-1 discovery well. Its main objective is to assess the productivity associated with a structural feature that is of a different style to those already tested at AT-5 and AT-8, and in an area between two known productive wells (AT-1 and AT-2).

It is anticipated that the well will take about 60 days to drill. Testing will be carried out with the rigless testing unit once it has completed operations on AT-7, which is anticipated to be around the middle of November 2011.

Brian O'Cathain, Chief Executive of Petroceltic commented:

"Although no gas flow rate has been achieved at this location, the result of the AT-6 well confirms the presence of the Ain Tsila gas column to the south of the 3D seismic area and provides further evidence of the significant scale of the Ain Tsila in place gas resource. The results of the overall programme to date have confirmed gas columns that have exceeded pre-drill expectation. We now look forward to seeing the results of a number of wells where we believe the potential for enhanced flow rates exist. The programme remains on schedule for submission of the Final Discovery Report in Q1 2012."

Ends

For further information, please contact:

Brian O' Cathain / Tom Hickey Petroceltic International Tel: +353 (1) 421 8300

Philip Dennis / Rollo Crichton Stuart, Pelham Bell Pottinger Tel: +44 (20) 7861 3919

Joe Murray / Joe Heron, Murray Consultants Tel: +353 (1) 498 0300

Hugh McCutcheon / John Frain, Davy Tel: +353 (1) 679 6363

Dr. Dermot Corcoran, Head of Exploration, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Dr. Corcoran has a B.Sc in Geology, a M.Sc. in Geophysics, and a Masters degree in Business Administration, all from the National University of Ireland, Galway. He also holds a Ph.D in Geology from Trinity College, Dublin. Dr. Corcoran has over 20 years experience in oil & gas exploration and production, and has previously worked at ExxonMobil, the Petrofina Group, and Statoil.

Notes to Editors:

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has exploration and appraisal assets in Algeria, the Kurdistan Region of Iraq and Italy.

This information is provided by RNS

The company news service from the London Stock Exchange

END

FURLLFIAAEIELIL

cynic - 16 Sep 2011 08:22 - 1099 of 1234

abandon hope all ye who enter here

ahoj - 16 Sep 2011 11:26 - 1100 of 1234

Cynic,
Does it worth buying here? Sorry, I can't understand what you meant above!

HARRYCAT - 16 Sep 2011 11:29 - 1101 of 1234

Chart.aspx?Provider=EODIntra&Code=PCI&Si

LOL! However his comment isn't of much help to those already in and trying to find a way out!

cynic - 16 Sep 2011 11:29 - 1102 of 1234

it means avoid or buy at your peril!

harry - jumping from a high balcony should work

ahoj - 16 Sep 2011 11:35 - 1103 of 1234

Thank you.

hermana - 16 Sep 2011 14:27 - 1104 of 1234

Market giving PCI a good kicking today. Be greedy when others are fearful...

halifax - 16 Sep 2011 15:50 - 1105 of 1234

or be stupid when others are sensible?

HARRYCAT - 16 Sep 2011 15:53 - 1106 of 1234

Er....man about to jump here!!! A little tact please! ;o)

halifax - 16 Sep 2011 16:03 - 1107 of 1234

Harry go to the army surplus and buy a parachute which are going cheap after the recent defence cuts!

HARRYCAT - 03 Oct 2011 10:50 - 1108 of 1234

StockMarketWire.com
Petroceltic International plc, the upstream oil and gas exploration and production company has issued an update on operations at the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria.

Brian O'Cathain, Chief Executive of Petroceltic commented: "We are delighted to have achieved such excellent flow results from the Ordovician reservoir at AT-8 without fracture stimulation.

"These results confirm the potential for good productivity towards the north of the field, are likely to have a positive impact on our estimate of recoverable gas reserves and are very encouraging for the ultimate commercial development of Ain Tsila.

"They will be incorporated into the Final Discovery Report, (Field Development Plan), which we plan to submit to the Algerian competent authorities by the end of January 2012.

"Our appraisal programme is continuing at a rapid pace with further results from AT-8, the AT-7 well test results, and the AT-9 well logging and testing scheduled before year end."

HARRYCAT - 10 Oct 2011 08:26 - 1109 of 1234

StockMarketWire.com
Petroceltic International plc has announced that fracture stimulation of the AT-8 well on the Ain Tsila discovery in Algeria has further enhanced the substantial pre-facture flow rates announced earlier this month to 38.6 mmscf/d.

In addition the well has produced over 1,100 barrels per day of condensate. These results exceed the previous best test results achieved at AT-1 and further confirm the high deliverability achievable in this field.

required field - 10 Oct 2011 08:28 - 1110 of 1234

Hate to admit it but I'm stuck in here, but this is a very good update......so quite pleased with this result.....just going to stay put until the markets recover as they should....

hermana - 02 Nov 2011 09:53 - 1111 of 1234

ENEL cash coming soon...

HARRYCAT - 08 Nov 2011 11:00 - 1112 of 1234

StockMarketWire.com
Petroceltic International has issued a positive update on its Algerian operations at the Ain Tsila field on its Isarene permit in south eastern Algeria

AT-7 well flows at 4.9 MMscf/d after fracture stimulation and AT-9 has successfully encountered improved reservoir quality

Brian O'Cathain, Chief Executive of Petroceltic commented: "We are delighted to have successfully fracture stimulated the AT-7 well. This result confirms that commercial gas rates can be achieved in the south of the field after the mixed results of AT-6.

"We are very encouraged by the logging results from AT-9, which was drilled on time and within budget, particularly as it extends the presence of this interval of high quality sand, successfully tested in AT-1 and AT-8, further south into the centre of the field.

Initial petrophysical evaluation indicates that this is the best quality reservoir encountered in any of the Ain Tsila wells to-date."

HARRYCAT - 14 Nov 2011 08:23 - 1113 of 1234

Almost back in profit! An unexpected turn of events.

niceonecyril - 14 Nov 2011 09:40 - 1114 of 1234

From: Tom Hickey
Sent: 13 November 2011 21:52
To: Tom Hickey
Subject: Exxon Mobil entry to Kurdistan

Dear All,

Many of you may have seen the recent rumours regarding the likely entry of Exxon-Mobil to Kurdistan the first supermajor to formally confirm its interest in this important emerging province.

These rumours were formally confirmed today at a conference in Erbil by Dr Ashti Hawrami, Oil Minister of the Kurdistan Region of Iraq. The Blocks allocated to Exxon are understood to be the following:

* Al Qush: located immediately west of Shaikhan (Gulf Keystone Petroleum), northwest of Erbil city.

* Baeshiqa: located immediately south of Ain Sifni (Hunt Oil), southeast of Al Qush.

* Pirmam: located immediately north of Mala Omar (OMV). The ancestral home and headquarters of KRG President Massoud Barzani is located within the boundaries of this block.

* Betwata: located immediately east of Harir (Marathon) and immediately north of Shakrok and east of Dinarta (both Petroceltic/Hess)

* Qara-Hanjeer: located immediately south-southwest of Chamchamal (Dana Gas/Crescent Petroleum/OMV/MOL).

* Sixth block: located immediately north-northeast of Arbat (Shamaran). Thus far is not officially named, is located along the border with Iran and includes in its area the important Penjwin border crossing.

Clearly the decision by Exxon to apply for acreage in Kurdistan represents a major endorsement of the prospectivity of the region and progressive nature of the Erbil administration, and follows the entry of other significant companies such as Marathon, Murphy, Hess, Maersk, Repsol and Vallares during 2010-11.

I attach a short presentation outlining the location of each of the Exxon Blocks relative to PCI acreage and existing producing fields in the Kurdistan Region of Iraq.

Tom Hickey

hermana - 15 Nov 2011 15:43 - 1115 of 1234

Tom a great addition to PCI BOD.

HARRYCAT - 07 Dec 2011 08:31 - 1116 of 1234

Petroceltic International plc the upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, is pleased to issue an update on operations at the Ain Tsila field in Algeria. Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending final ratification by the Algerian authorities.

Highlights
AT-9 well flows at 43.9 MMscf/d from the Upper Zone and 8.9 mmscf/d from the Lower Zone without fracture stimulation
Substantial condensate yields from both zones - 1,005 bpd from the Upper Zone and 205 bpd from the Lower Zone
Highest pre-fracture stimulation flow rates achieved to date on the Ain Tsila field
The well will not be fracture stimulated at this time as current test rates are already limited by surface facility capacity.
2011 Algerian appraisal drilling and testing programme now complete - all 6 wells successfully tested gas columns
3 of the total of 9 wells drilled have flowed gas at rates in excess of 33 mmscf/d.
Register now or login to post to this thread.