Sharesmagazine
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Share Price   Awards   Market Scan   Videos   Broker Notes   Director Deals   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Indices   Forward Diary   Forex Prices   Shares Magazine   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Comparison Tables   Spread Betting 
You are NOT currently logged in
Register now or login to post to this thread.
  • Page:
  • 1
  • ...
  • 4
  • 5
  • 6
  • 7

Oilex NL - One to buy (OEX)     

hlyeo98 - 11 May 2006 13:30

This is a good growth oil company - its Block 56 in Oman have significant oil bearing structures. it said that the possible presence of a thicker sedimentary section in the eastern area implied a more extensive distribution of the Ara Salt unit into Block 56 and raised the possibility of salt related structures similar to those producing to the west in the main salt basin.


ravey davy gravy - 16 Sep 2010 10:06 - 115 of 135

They chase it to 21p on the news and now it's 10p bid again, bet the advfn
pump and dump mob were laughing at that one.

Guess it's time to watch more closely for a entry point.

ravey davy gravy - 21 Sep 2010 14:55 - 116 of 135

Too easy this, buy when nobody else wants them sub 11p and now look at the
herd chase it when it's up a double digit % :-))

HARRYCAT - 13 May 2011 14:47 - 117 of 135

2 May 2011
La Rocca-1 well spuds on WA-388-P, Offshore Western Australia

Oilex Ltd advises that the "Ocean Patriot" rig has arrived at the La Rocca-1 well location and the well was spudded at 3:20 hours
(WST) on 30 April 2011.

Report date: 1 May 2011

Status: Commenced picking up drill pipe

Operations: * Spudded well

* Drilled 660mm / 914mm hole from 422 metres to 468
metres.

* Ran & set 762mm (30") casing

Water depth 401 metres

Objectives Intra Mungaroo channel zone

Planned total depth Approximately 5,100 metre(TD):

Days to TD: 41 days on a trouble free basis

HARRYCAT - 23 May 2011 08:53 - 118 of 135

23 May 2011
La Rocca-1 Well, WA-388-P Offshore Western Australia Report NO 4

Oilex Ltd has been advised by the Operator that as at 0600 hours on 22 May 2011, the La Rocca-1 well has drilled to a depth of 3,579 metres and is drilling ahead. It is anticipated that the objectives could be intersected within the next few days.

Report date: 22 May 2011

Status: * Drilling ahead below 3.579

Past Week's Operations: * Drilled 311 mm (12 ") hole to 3,478 metres and
ran 244 mm (9 ⅝") casing

* Cemented and tested casing

* Drilled 216 mm (8 ") hole from 3,478 metres to
3,579.0 metres

HARRYCAT - 25 May 2011 13:28 - 119 of 135

Oilex Ltd
La Rocca-1 Well WA388P Western Australia Update

25 May 2011

La Rocca-1 Well, WA-388-P Offshore Western Australia - Update
Oilex Ltd ("Oilex" ASX: OEX, AIM: OEX) has been advised by the Operator that
the La Rocca-1 exploration well has reached total depth of 4,864 metres after
drilling through the Intra Mungaroo Formation channel sandstone primary
objective. There are no indications of gas in the LWD and mud log data and
final wireline logs will now be run.

HARRYCAT - 08 Jun 2011 08:51 - 120 of 135

StockMarketWire.com
Oilex Ltd advises that the Cambay-76H horizontal well was spudded at 00:00 hours (WST) on 8th June 2011.

The Cambay-76H "proof of concept" well will evaluate the production potential of the Y Zone interval of the extensive Eocene "tight" reservoirs in the onshore Cambay Production Sharing Contract ("PSC") in Gujarat State, India.

It is estimated that the well, which includes a 610 metre lateral section, will take approximately 35 days to drill and complete. An 8 stage fracture stimulation program of the Eocene "tight" reservoir Y Zone will then be conducted.

After well clean-up, it is anticipated that a long term production test will be performed to determine flow rates, quality of hydrocarbons and commercial viability.

HARRYCAT - 15 Jun 2011 09:22 - 121 of 135

Chart.aspx?Provider=EODIntra&Code=OEX&SiStockMarketWire.com
Oilex Ltd advises that at 14th June 2011 the Cambay-76H horizontal well was drilled to a depth of 601 metres and is preparing to drill ahead.

The Company insists it is making progress in unlocking the potential of the Cambay "tight" Eocene reservoirs that extend across the 161 km2 Cambay Production Sharing Contract area in onshore Gujarat, India.

The Company intends to evaluate and exploit these reservoirs using horizontal drilling and fracture stimulation technology that has been developed and proven in North America.

The Cambay-76H "proof of concept" horizontal well will evaluate the production potential of the Y Zone interval of these "tight" reservoirs. An 8 stage fracture stimulation program will be conducted and after well clean-up, it is anticipated that a long term production test will be performed to determine flow rates, quality of hydrocarbons and commercial viability.

HARRYCAT - 22 Jun 2011 08:10 - 122 of 135

StockMarketWire.com
Oilex has announced that its Cambay-76H horizontal well in India was directionally drilled as planned to casing point at 1,595 metres.

The company is making progress in unlocking the potential of the Cambay "tight" Eocene reservoirs that extend across the 161 km2 Cambay Production Sharing Contract ("PSC") area in onshore Gujarat, India. It intends to evaluate and exploit these reservoirs using horizontal drilling and fracture stimulation technology that has been developed and proven in North America.

The Cambay-76H "proof of concept" horizontal well will evaluate the production potential of the Y Zone interval of these "tight" reservoirs. An 8 stage fracture stimulation programme will be conducted and after well clean-up, it is anticipated that a long term production test will be performed to determine flow rates, quality of hydrocarbons and commercial viability.

HARRYCAT - 29 Jun 2011 07:45 - 123 of 135

StockMarketWire.com
Oilex Ltd is making progress in unlocking the potential of the Cambay "tight" Eocene reservoirs that extend across the 161 km2 Cambay Production Sharing Contract ("PSC") area in onshore Gujarat, India.

The Company intends to evaluate and exploit these reservoirs using horizontal drilling and fracture stimulation technology that has been developed and proven in North America.

The Cambay-76H "proof of concept" horizontal well will evaluate the production potential of the Y Zone interval of these "tight" reservoirs.

An 8 stage fracture stimulation program will be conducted and after well clean-up, it is anticipated that a long term production test will be performed to determine flow rates, quality of hydrocarbons and commercial viability.

HARRYCAT - 06 Jul 2011 08:07 - 124 of 135

StockMarketWire.com
Oilex Ltd advises that on 5th July, 2011 the Cambay-76H horizontal well was drilled to a total depth of 2,740 metres and the completion string has now been run successfully.

The drilling rig will now be demobilized in preparation for mobilizing the multi-stage fracture stimulation equipment and related services.

HARRYCAT - 13 Jul 2011 08:43 - 125 of 135

13th July 2011

Cambay-76H "Tight" Reservoir Well Report No 6

Oilex Ltd ("Oilex" ASX: OEX, AIM: OEX) advises that operations are continuing to demobilise the Black Pearl rig and associated drilling equipment.

Mobilization of the equipment required to conduct the large volume multi-stage fracture stimulation of the Y Zone tight gas reservoir is near completion and rigging up is progressing. In total, 16 zones will be stimulated in 8 stages over the length of the horizontal section of the well bore (approximately 600 metres).

HARRYCAT - 20 Jul 2011 08:31 - 126 of 135

20th July 2011
Cambay-76H "Tight" Reservoir Well Report No 7
Oilex Ltd advises that the mobilization and rigging up for the large volume multi-stage fracture stimulation of the Y Zone tight gas reservoir is progressing well and all equipment is expected to be on site and rigged up within the next few days.

The demobilisation of the Black Pearl drilling rig is also nearing completion.

After rigging up of the fracture stimulation equipment is completed, a fracture stimulation program comprising 8 stages with two fracture initiation points per stage will commence. The well will then be flowed to surface to clean up, removing stimulation fluids from the well bore prior to conducting the flow test.

The monsoon season has commenced in Gujarat and the progress of operations is contingent on variable weather conditions. To date there have been some minor interruptions to activities due to weather.

HARRYCAT - 27 Jul 2011 07:59 - 127 of 135

27th July 2011

Cambay-76H "Tight" Reservoir Well Report No 8
Oilex Ltd ("Oilex" ASX: OEX, AIM: OEX) advises that the mobilization for the
large volume multi-stage fracture stimulation of the horizontal Cambay-76H well
has been completed with all equipment now on site and rigged up. The Black
Pearl drilling rig has been fully demobilised from site.

In preparing for the start of the fracture stimulation program; a test of all
surface equipment has been conducted, mixing of chemicals and loading of
proppant and water to tanks is underway and coiled tubing operations are being
completed.

The fracture stimulation program will comprise eight stages with two fracture
initiation points per stage. The well will then be flowed to surface to remove
stimulation fluids and clean up the well bore prior to conducting the flow
test.

The Cambay-76H "proof of concept" horizontal well is evaluating the production
potential of the Y Zone interval of the extensive Eocene "tight" reservoirs in
the onshore Cambay Production Sharing Contract ("PSC"), Gujarat, India.

HARRYCAT - 03 Aug 2011 08:21 - 128 of 135

3 August 2011

Cambay-76H "Tight" Reservoir Well Report No 9
Oilex Ltd ("Oilex" ASX: OEX, AIM: OEX) advises that the first stage of the
large volume multi-stage fracture stimulation program of the horizontal
Cambay-76H well has been completed successfully and the second stage is now
under way.

The fracture stimulation program comprises eight stages with two fracture
initiation points per stage. After completion of the fracture stimulation
program the well will be flowed to surface to remove stimulation fluids from
the well bore (well clean-up phase) and then a flow test will be conducted.

The Cambay-76H "proof of concept" horizontal well is evaluating the production
potential of the Y Zone interval of the extensive Eocene "tight" reservoirs in
the onshore Cambay Production Sharing Contract ("PSC"), Gujarat, India.

HARRYCAT - 10 Aug 2011 08:06 - 129 of 135

StockMarketWire.com
Oilex Ltd has advised that all eight stages of the fracture stimulation program of the horizontal section in the Cambay-76H well were pumped successfully and according to plan.

The well is currently being prepared for flow to surface to remove stimulation fluids from the formation (well clean-up phase). After the completion of the clean-up operations a flow test will be conducted.

The Cambay-76H 'proof of concept' horizontal well is evaluating the production potential of the Y Zone interval of the extensive deep Eocene reservoirs in the onshore Cambay Production Sharing Contract area, Gujarat,India.

HARRYCAT - 17 Aug 2011 08:24 - 130 of 135

17 August 2011

Cambay-76H "Tight" Reservoir Well Report No 11
Oilex Ltd advises that the well is being prepared for well clean-up flow and production testing. The well is currently being flowed to surface to remove stimulation fluids from the eighth fracture stimulation stage and hydrocarbons are being flowed intermittently to surface along with the stimulation fluids. Milling operations to open up the remaining seven fracture stimulation stages have started. After the completion of the clean-up operations a flow test will be conducted.

The Cambay-76H "proof of concept" horizontal well is evaluating the production potential of the Y Zone interval of the extensive deep Eocene "tight" reservoirs in the onshore Cambay Production Sharing Contract area, Gujarat.

HARRYCAT - 24 Aug 2011 07:49 - 131 of 135

24 August 2011
Cambay-76H "Tight" Reservoir Well Report No 12

Oilex Ltd ("Oilex" ASX: OEX, AIM: OEX) advises that operations to prepare for
well clean-up flow and production testing are continuing. Some delays have been
experienced during coil tubing unit interventions to open up the remaining
fracture stimulation stages.

After clean-up operations a flow test will be conducted.

HARRYCAT - 31 Aug 2011 08:25 - 132 of 135

31 August 2011

Cambay-76H "Tight" Reservoir Well Report No 13
Oilex Ltd advises that operations to prepare for well clean-up flow and production testing are continuing. The coil tubing unit was not able to retrieve milling tools being used to open the second fracture stimulation stage. Consequently, it is planned to mobilise a work-over rig to the well location to retrieve the milling tools. Following this, operations will resume to open up the remaining fracture stimulation stages so that clean-up operations and a flow test can be conducted.

The Cambay-76H "proof of concept" horizontal well is evaluating the production potential of the Y Zone interval of the extensive deep Eocene "tight" reservoirs in the onshore Cambay Production Sharing Contract area, Gujarat, India.

skinny - 05 Mar 2012 16:31 - 133 of 135

Oil & Gas Sector: Oilex up after successful operation to retrieve equipment at Cambay well


Shares in Oilex (LON:OEX) jumped after it revealed a successful operation to retrieve the stuck milling assembly and coiled tubing at the Cambay-76H horizontal well onshore Gujarat, India.

Oilex said the well was currently being prepared for resumption of milling of the seven remaining fracture stimulation stages and when this operation was completed, production tubing would be run and the well would be flowed to surface for clean-up and production testing.

pim - 10 Nov 2015 23:55 - 134 of 135

waiting for the right time to buy

Placing was underwritten and was around 100% dilution at 2p so I'm seeing 1180m and a cap of around £16m, about £15m of that being cash