HARRYCAT
- 07 Jul 2010 13:35
- 1191 of 5505
Hopeless chart. Can't see any support anywhere.
Proselenes
- 07 Jul 2010 13:53
- 1192 of 5505
I brought some of this shite around 75p levels - I really wish I did not now.
Hopefully that will change.
required field
- 08 Jul 2010 08:47
- 1193 of 5505
Patience.....this used to be 120p.....so bargain levels now......screaming sell at 67p ?....hardly.....
hlyeo98
- 08 Jul 2010 08:52
- 1194 of 5505
Trend is not healthy looking though...
required field
- 08 Jul 2010 08:52
- 1195 of 5505
Sell....sell....selll....screaming....sell....oh ! giggly giggles all round....
HARRYCAT
- 12 Jul 2010 08:13
- 1196 of 5505
StockMarketWire.com
"Gulf Keystone Petroleum is to carry out additional testing on the Shaikan-1 discovery well in the Kurdistan region of northern Iraq.
Gulf Keystone says it will carry out the following work programme:
Zone three: Re-test the Butmah (lower Jurassic) formation, from 1,783 metres to 1,814 metres depth in the well.
Zone two: Re-test the Mus (upper Jurassic) formation, from 1,627 metres to 1,667 metres.
Zone one: Complete the well for long term production testing (18 to 24 months) in the original discovery zone, the Sargelu (upper Jurassic, 1,450 metres to 1,510 metres).
Drill an appraisal well through the Cretaceous intervals, 50 metres to the east of the existing Shaikan-1 well. "
Proselenes
- 12 Jul 2010 09:43
- 1197 of 5505
But its all bull unless they sort out the bloody licenses.
If they cannot sort out the licenses before too many new moons then they are going to be in deep crap.
I really regret buying this at just over 75p now ! Hopefully things will turn around before October.
dealerdear
- 12 Jul 2010 10:30
- 1198 of 5505
Pros
I thought you were saying on the rkh thread that the trouble with people is when they have a loss they never cut their losses and sell but simply say 'Wait for the recovery'
Um, pot, kettle and black?
Proselenes
- 12 Jul 2010 10:37
- 1199 of 5505
dealerdear, not me.
I say that to people who promote "taking profits" but then fail to "cut losers".
If this gets to 20% down, I will likely sell it and cut the loser. Its not there yet, so no need to cut as yet.
kuzemko
- 12 Jul 2010 10:38
- 1200 of 5505
3. Zone one: Complete the well for long term production testing (18 to 24 months) in the original discovery zone, the Sargelu (upper Jurassic, 1,450 metres to 1,510 metres). This zone has a higher GOR, in the range of 120 cubic feet of gas per barrel of oil, and demonstrated natural flow rates of almost 7,500 bopd, despite the limitations of the original test equipment. It is the current intention that this production will be processed, through the facilities currently being constructed, and sold.
AND SOLD
AM I MISSING SOMETHING HERE OR IS THIS GOOD NEWS
required field
- 12 Jul 2010 10:47
- 1201 of 5505
Yes, but if you go by the above poster...nothing is any good at all except Rockhopper.....ridiculous at times....this looks promising to me....
cynic
- 12 Jul 2010 11:20
- 1202 of 5505
that's not quite fair or accurate even if he does drivel on a bit about RKH ..... perhaps he's o'weight and there is a certain fear element
Proselenes
- 12 Jul 2010 11:41
- 1203 of 5505
Are you calling me fat cynic, thats fighting talk.......! ;)
cynic
- 12 Jul 2010 12:16
- 1204 of 5505
oh yeah! you calling me outside then big boy? ..... you and whose army?
Proselenes
- 12 Jul 2010 12:17
- 1205 of 5505
Fight fight fight fight fight fight..........
cynic
- 12 Jul 2010 12:19
- 1206 of 5505
time to ajourn to the gaza thread then!
kuzemko
- 12 Jul 2010 13:37
- 1207 of 5505
so the news is positive"sold" as in getting revenue from oil production in 4-5 months?????????????????
Proselenes
- 17 Jul 2010 05:48
- 1208 of 5505
Sold all my GKP.
Put it into Aminex (AEX) on the news yesterday of the Wilcox deep drill spud. TD in 3 to 4 weeks. If its good then lots of upside for AEX.
Balerboy
- 19 Jul 2010 07:59
- 1209 of 5505
This should keep everyone interested:
Gulf Keystone announces the arrival of the initial loads of production facility equipment to the Shaikan field location and the commencement of the rig move by the AOS Discover-1 drilling rig to the Sheikh Adi-1 exploration well site.
The first pre-packaged production equipment units have arrived at the production facility construction site near the Shaikan-1 well location. This equipment together with the oil storage tanks and truck loading facility will form the basis of an 18,000 bopd capacity oil production treating and truck loading facility.
This facility will be used during the long term production testing of the Sargelu (upper Jurassic) oil reservoir in the Shaikan-1 discovery well (reference 12 July 2010 announcement with respect to workover rig operations). Production testing will last for at least 18 to 24 months and accumulate valuable data related to reservoir characteristics and oil recovery factors. The test volumes (estimated at 8,000 to 10,000 bopd) will generate Gulf Keystone's first oil production revenue in Kurdistan.
In addition, the AOS Discoverer-1 drilling rig has arrived at the Sheikh Adi-1 well site and rig up is 10% complete. This well will be Gulf Keystone's first exploration well on the Sheikh Adi block in which the Company has an 80% working interest. The well is planned to spud in August and will target the Cretaceous, Jurassic and Triassic formations. Planned total depth, depending on well results, is 3,850 meters and drilling is expected to take 6 months. The Company's estimated oil-in-place resource potential for the Sheikh Adi structure is in excess of one billion barrels.
chav
- 19 Jul 2010 13:00
- 1210 of 5505
Would have to be tempted at 60p