chav
- 01 Dec 2009 20:55
www.presidentpc.com
Producing Oil/nat gas from the ELV field/USA....45% of Oil/Gas produced hedged at $100/bbl and $10.90 per mcf)
Drilling ELV.....Suspended until gain consent for sidetrack...casing and wellhead left in for future re entry
3D Seismics have been shot on PEL82 Otway Basin Australia....results are excellant!
PEL 82 Potential resource increased from 150mbbls Oil tooooooo 430mbbls Oil!
Also trading on Plusmarkets
http://www.plusmarketsgroup.com/data.shtml?ISIN=GB00B3DDP128/GBX/PLUS-exn
chav
- 17 Dec 2010 18:17
- 128 of 228
very nice finish to PPC's week.
mitzy
- 17 Dec 2010 18:24
- 129 of 228
Truely amazing.
andysmith
- 20 Dec 2010 09:56
- 130 of 228
Nice little profit taken today just in time for Christmas but will re-invest in New Year when Aussie drilling takes place as this would be the real game changer for PPC
chav
- 20 Dec 2010 12:16
- 131 of 228
A few taking some profits this morning Andy.
Whilst PEL 82 in OZ could be the biggest game changer, success with the present drill should give good upside to the sp at it's present value.imo
andysmith
- 20 Dec 2010 12:46
- 132 of 228
Success in the first drill will under-pin the price ahead of Oz drilling which will make this a very strong buy and as its off the radar to many at the moment there will be chance to buy in whether it falls on news or flys if good.
chav
- 20 Dec 2010 15:26
- 133 of 228
The Oil/gas found at Kaf3 will be quickly online and converted into $'s.
andysmith
- 23 Dec 2010 12:26
- 134 of 228
Back in this morning at 10% lower price than sold, some profits locked in but don't really want to be out for long with drill results soon from Louisiana and then in Oz
chav
- 24 Dec 2010 13:00
- 135 of 228
Nice to finish Blue for Christmas and hopefully the drill results will provide more cheer after Christmas :-)
maggiebt4
- 24 Dec 2010 13:44
- 136 of 228
Happy Christmas Chav and all other holders. Think there might be an even happier new year!
chav
- 25 Dec 2010 10:57
- 137 of 228
Merry Christmas maggie and fingers crossed for a prosperous PPC in the New Year.
chav
- 30 Dec 2010 08:13
- 138 of 228
TSTD BOPS 12/21/10; DROPPED 7/8" SHACKEL INSIDE 9-5/8" CSG; FISHED OUT SHACKEL; D/O SHOE TRACK; ATTEMPTED TO FIT, FAILED; SET RTNR @ 11834' & SQZD; DRLD RTNR, CMT, FORMATION T/ 12016'; DIR DRLD F/ 12016-12400';
Should be about at TD now.
maggiebt4
- 30 Dec 2010 08:50
- 139 of 228
Wish I understood all that Chav Hope it's good news! :-)
LR2
- 30 Dec 2010 17:20
- 140 of 228
Maggie, here's an explanation that was posted elsewhere, courtesy of a guy named Swampydrill.
Little bit of explanation: Tested the BOP again, some berk has dropped a shackle in the hole which was probably fished with a magnet, drilled out the casing shoetrack and attempted a formation integrity test: FIT which failed (may have had losses on bottom during cementing the casing or over displaced shoetrack, don't know)set a retainer and pumped / squeezed cement around the shoe to give it strength (in case of another kick), drilled to 12,016 and then directionally drilled to 12,400ft, so still making progress, no need for any negativity at all, basic drilling issues you get on any well.
maggiebt4
- 31 Dec 2010 09:56
- 141 of 228
Thanks LR Now understand that at least it's not bad news - good.
LR2
- 31 Dec 2010 11:18
- 142 of 228
Not bad news but it may have delayed them a bit.
chav
- 31 Dec 2010 12:12
- 143 of 228
A delay isn't a problem, providing the Deeps provide!
chav
- 04 Jan 2011 08:04
- 144 of 228
Tuesday 4 January 2011
PRESIDENT PETROLEUM COMPANY PLC
("President" or "the Company")
Drilling Update
President announces an update on its drilling operations in Louisiana, USA and South Australia.
Kafoury 3 Well, East Lake Verret Field ("ELV"), Louisiana
The Kafoury 3 well has reached a measured depth of 12,556 feet just above the key deeper targets for the well. This is the first well drilled into this fault block at ELV and has encountered greater pressures and complexity than anticipated. A number of actions have been taken to ensure full control over the well with extra casing and increasing mud weights. Drilling is currently halted to install a drilling liner. As a result, the well is taking longer than anticipated, with a corresponding increase in costs.
Structurally, the well is in a good position relative to the deeper sands, and drilling to target will resume once the liner is installed. Further announcements will be made in due course.
East White Lake Field ("EWL"), Louisiana
Peak Energy LLC ("Peak"), the operator of EWL, is still waiting on the rig to drill the two proven undeveloped prospects in the field. Rig availability is tight at present but Peak has been informed that it is next in line for the rig.
PEL 82, South Australia
Construction of the well-site and drilling pad commenced in mid-December and is currently 50% completed. Drilling of water bores has been completed and the work on support services and drilling preparation is progressing to plan. The Company is monitoring the extremely wet weather currently being experienced in Australia as this represents the greatest risk to the projected February 2011 spud date.
chav
- 04 Jan 2011 08:24
- 145 of 228
Not sure why that rns has spooked the sp down!!..looks like good news to me apart from the drilling being more tricky.
maggiebt4
- 04 Jan 2011 08:32
- 146 of 228
Could it be the last sentence about the weather creating another delay?
HARRYCAT
- 04 Jan 2011 08:37
- 147 of 228
Weather delay, extra costs & high pressure all contributing factors to sp drop, imo. This prices in the extra, unforeseen risk. When the extra cost factor is quantified, sp may correct again if it is very high.