Sharesmagazine
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Share Price   Awards   Market Scan   Videos   Broker Notes   Director Deals   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Indices   Forward Diary   Forex Prices   Shares Magazine   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Comparison Tables   Spread Betting 
You are NOT currently logged in
Register now or login to post to this thread.

Leed Petroleum - commercially productive drilling (LDP)     

ValueMax - 08 Jan 2008 08:18

leed_petroleum_logo.pngChart.aspx?Provider=Intra&Code=LDP&Size=Chart.aspx?Provider=EODIntra&Code=LDP&Si
1 April 2008 Oil & Liquids (mmbbls) Gas (bcf) Total (mmboe)
1P Reserves 3.85 47.2 11.7
2P Reserves 7.87 97.22 24.1
3P Reserves 16.25 322.39 70.0
The next independent reserve report is expected to be published by 31 March 2009
Asset Summaryassetswb1.jpg Operations Mapmapdd0.jpg Oil Pricechart?chart_primary_ticker=ICEEUR:BRN&ch
Assets:Eugene Island (blocks 172, 183, 184)A-6 well flowing at 498 boepd (374 boepd working interest). Awaiting recompletion from primary zone during Q1 2009. A-7 well flowing at 2177 boepd (1623 boepd working interest). Well originally tested at approx 4000 boepd, but water level have been increasing. A-8 well flowing at 2557 boepd (1918 boepd working interest).Grand Isle (blocks 95, 100) Assessing seismic data, finalising well plansShip Shoal (block 201) Commencing operations during 2009. Fast tracking drill of wells 1 and 2.South Marsh Island (blocks 5, 6) Block 6 due to be drilled in first half of 2009. Installing platform and pipeline.Sorrento Dome Drilling plans finalised. Seeking drilling rig for well 13-1. LDP news - RSS Feed

ValueMax - 06 Jan 2009 09:27 - 151 of 235

As far as we know, A-7 is unchanged and producing at around 4000boepd, bringing the total current production from Eugene Island to around 6000boepd, excluding A-6 from the figures until it is recompleted.

I think the company are sensible in reducing costs while oil price is low and rig price high.

Hopefully A-8 will not encounter the same problems A-6 had from the reservoir.

ValueMax - 06 Jan 2009 12:59 - 152 of 235

I've updated the header with the A-8 flow info.

For anyone interested in an RSS feed of the latest Leed news releases, I've added the orange button at the bottom of the header. It works for me in Firefox, but I've not tested with IE/Chrome/Safari etc, so let me know if it works. It should add a 'live' bookmark to your browser which updates whenever Leed release news.

niceonecyril - 06 Jan 2009 14:11 - 153 of 235

Max
Your IT skills are way ahead of mine, i really like the set up and yes it does work.

Todays news has gone down like a lead balloon, pity as its actually good,
unfortuately the market will take sometime to cotton on. Failure to give out
flow rates on A-7 to me gave the wrong signals out, i'm wondering what those
who wrote this latest release are thinking?
cyril

ValueMax - 12 Jan 2009 09:25 - 154 of 235

A-6 producing at GROSS AVERAGE OF 498 BOEPD (374 BOEPD ON A WORKING INTEREST BASIS)

A-7 producing at GROSS AVERAGE OF 2,177 BOEPD (1,623 BOEPD ON A WORKING INTEREST BASIS). HIGHER THAN EXPECTED WATER PRODUCTION HAS RESULTED IN THE WELL PRODUCING AT A LOWER RATE THAN ORIGINALLY TESTED.

A-8 flowing at GROSS RATE OF 2,557 BOEPD (1,918 BOEPD ON A WORKING INTEREST BASIS). THE WELL PRODUCTION IS STABLE WITH NEGLIGIBLE WATER BEING OBSERVED.


Sorry about the caps, I copied directly from today's RNS.

niceonecyril - 12 Jan 2009 23:57 - 155 of 235

Nice to see reserves up almost 20% and 3700+bopd,some concern, A-6 now A-7
although A-8 is ok? The reserves i believe covers the M/Cap so we're accumilating cash which in todays market can't be bad.
cyril

ValueMax - 15 Jan 2009 22:12 - 156 of 235

Understandable concerns however the causes of the problems at A-6 and A-7 are different so it's not a consistent issue across the asset.

ValueMax - 25 Feb 2009 08:16 - 157 of 235

A-6 flowing again, 1750 boepd.

niceonecyril - 25 Feb 2009 08:29 - 158 of 235

Yes now what that will do for the SP, in this market is anyone's guess? As a long
term investment i'm happy with cash that this will accumilate, prior to further future drilling.
cyril

ValueMax - 25 Feb 2009 13:28 - 159 of 235

In this market, who knows

But this market won't last forever, and Leed are well set to rise longer term. Minimise costs for the rest of Q1 and Q2 will allow them to maximise their profits despite the low oil price.

And if the oil price recovers to ~$70 this year... Leed will be in a really fantastic position.

niceonecyril - 11 May 2009 10:05 - 160 of 235

For a M/Cap of just 56.6m.

Leed Petroleum PLC (AIM: LDP), the oil and gas exploration and production company focused on the Gulf of Mexico, announces an update on production and the operational capacity at the Eugene Island and non-operated East Cameron and Main Pass fields. For the three months ended 31 March 2009, the Company booked net oil and gas sales volumes of 118,113 bbls and 782,731 Mscf attributable to the Eugene Island field which equates to an average gross sales rate of approximately 4,600 BOEPD.

Eugene Island Field Production

Average Eugene Island production for the quarter was affected by gas compressor repair and maintenance, gas sales pipeline availability and the A-6 well being shut-in for approximately 4 weeks during the well recompletion.

The Company has recently received notice from Transcontinental Gas Pipe Line Company, LLC ('TGPL') stating that the pipeline system is experiencing high utilisation of services, pipeline maintenance and various compressor station maintenance activities. These have resulted in reduced operating flexibility, and TGPL has advised that this situation may continue for the next several weeks.

The operational difficulties being experienced on the TGPL pipeline system have affected Leed's ability to sell its production from the Eugene Island field with approximately five days of associated shut-in during April 2009 and two days to date in May 2009. Prior to these difficulties, due to a combination of natural decline and operational constraints, the field was producing at a gross rate of 5,000 BOEPD and is currently producing at this rate.

Non-Operated Properties

Leed has previously announced that the non-operated East Cameron field, in which Leed holds a 25% working interest, is shut-in because of hurricane related damage to a non-company owned pipeline that carries gas from the Gulf of Mexico to an onshore treatment facility. Recently, further damage has been discovered on the pipeline, which will further delay the restoration of production. Historically, East Cameron represents a small proportion of Leed's production volumes.

Production at the Company's Main Pass field was curtailed during the quarter due to a lack of field gas necessary to lift oil out of the wellbores. The Operator is addressing this issue. Main Pass also represents only a small proportion of Leed's production volumes.

Further Updates

The Company will provide additional information on the status of its Eugene Island and East Cameron fields as appropriate.

cyril


justyi - 12 May 2009 22:07 - 161 of 235

Chart.aspx?Provider=EODIntra&Code=LDP&Si

wizardsleeve - 16 Sep 2009 09:00 - 162 of 235

news out on this one today and seem to be making a move north........keep it up..

wizardsleeve - 16 Sep 2009 09:04 - 163 of 235

RNS Number : 1393Z
Leed Petroleum PLC
16 September 2009




For immediate release


16 September 2009



Leed Petroleum plc


("Leed" or the "Company")


Operations update


Leed reports successful flow test at Sorrento Salt Dome, onshore Louisiana


Leed Petroleum plc (AIM:LDP), the oil and gas exploration and production company focused on the Gulf of Mexico, today announces the successful flow testing of the onshore Louisiana Sorrento Dome United Lands "14-1" Well, which the Company plans to return to production.


The Sorrento Dome field is located in Ascension Parish, Louisiana, approximately 50 miles northwest of New Orleans. The field was discovered by Gulf Refining Company in 1929 and was primarily developed by Texaco during the 1950s. To date, the field has produced 750 BCF and 5,000 MBO. Leed acquired a 100 per cent. operated working interest in a portion of the Sorrento Dome field in April 2007 including the shut-in United Lands 13-1 and 14-1 wells and associated facilities .


The 14-1 well (Leed: net working interest 100%), was shut-in during 2006 following various attempts to isolate water production. Leed's previous plans involved drilling a sidetrack of the well, however, a water saturation log was run in the well during July 2009, which showed significantly higher hydrocarbon saturation in the vicinity of the perforations than previous logs run during 2004 and 2006. A flow test was subsequently conducted through the existing facility over four days and a stable but restricted flow rate of 1.3 mmcfd (217 boepd), 1785 bwpd, 644 ftp on a 30/64th to 32/64th choke was established for an extended 3 day period. Bottom hole pressure gauges confirmed stable flowing bottom hole pressures during the flow period.


Leed plans to convert the existing temporarily abandoned United Lands 11-1 well to a salt water disposal well and install a new gas sales meter on location prior to restoring production from the United Lands 14-1 well.


The work is planned over the coming months with production scheduled to commence early Q1 2010.


Howard Wilson, President and Chief Executive of Leed, commented:


"The successful flow test of the 14-1 well at the Sorrento Dome Field is the first step after the Eugene Island drilling program towards an increased and diversified production base.


The project will require minimal capital outlay and low operating expenses will be incurred once production is established. We expect to commence gas sales in time to take advantage of the historically higher winter natural gas prices. We are very pleased to be able to restore production from the 14-1 well, which has enabled the Company to accelerate production whilst removing capital costs from the project."


For further information please contact:


Leed Petroleum PLC




Howard Wilson, President and Chief Executive


+1 337 314 0700

James Slatten, Chief Operating Officer


+1 337 314 0700






Matrix Corporate Capital LLP




Alastair Stratton


+44 20 3206 7204

Tim Graham


+44 20 3206 7206






Buchanan Communications Ltd




Ben Willey


+44 20 7466 5118

Bobby Morse


+44 20 7466 5151

Chris McMahon


+44 20 7466 5156


NOTES TO EDITORS


Review by a qualified person


The information contained in this announcement has been reviewed and approved by Chris Thompson, Manager of Business Development at the Company, BSC GradDip, who is a reservoir engineer (SPE) with over 17 years experience within the sector.


Operations


Leed Petroleum PLC is an AIM quoted independent oil and gas exploration and production company. The Company's operations are concentrated in the Gulf of Mexico region where Leed has established a significant portfolio of producing and development assets. The Company has interests in 18 offshore fields and one onshore field in the region.


Leed's strategy is to grow the Company's portfolio through organic development of its existing assets and to utilise its regional expertise to identify and purchase value adding assets.


Glossary


boepd - barrels of oil equivalent produced per day


mmcfd - million cubic feet of gas produced per day


bwpd - barrels of water per day


ftp - flowing tubing pressure



This information is provided by RNS
The company news service from the London Stock Exchange

END

Balerboy - 16 Sep 2009 09:21 - 164 of 235

Should be a bit of profit in this, I had it on my watch list at around 20-21p so if it climbs back to those levels very nice.

niceonecyril - 16 Sep 2009 12:26 - 165 of 235

B/boy i sold out of these several months ago,they have had problems,some due to hurricane damage which i believe is still not resolved? With the hurricane season
upon them, could be a problem(but much is in the SP). Having said that it has a lot of potential and will imo come good,just a lot of patience may be required.
cyril

kuzemko - 09 Mar 2010 21:02 - 166 of 235

please advice.
i placed my order this morning with barclays stockbrs. quote and deal. message from brokers " problem occured please contact us or our brokers can only execute this order at best at 5.75p. i ignored it and place my order again" quote and deal" the same message came up. at the same time i was looking at live streaming. and the price was 5.75p with 0%spread, so i clicked buy and my order was executed that moment at 7p. was i a victim to high frequency trading or some thing else. it seems very odd. surely not MIFID!!! what do you think???
i have contacted bstock and still waiting for a reply

niceonecyril - 09 Mar 2010 22:30 - 167 of 235

Sorry can't help,although i believe theires a 20 min delay i've cancelled and had an order cancelled so if you notified then within that time you may have a case to pull out of sale?
Wwhy not ask on the ttalk to yourself thread as it seems to be well read
maYbe someone may know what to do?
Search for under nowt.
cyril

kuzemko - 10 Mar 2010 08:24 - 168 of 235

thanks,
see the price stockbroker displayed was 5.75p all happened in nano second i clicked buy the next think i know they bought it at 7p instant 30% loss

dealerdear - 10 Mar 2010 08:40 - 169 of 235

I've got Leeds on my live streaming as I am a holder and at one point yesterday morning the offer was 7p and the bid was 5.75p. It lasted a minute or two which I suspect your order was executed.

niceonecyril - 10 Mar 2010 09:16 - 170 of 235

kuzemko thats rough on you,but it should work out,as 6000bopd expected by end of year and 11k end if 2011?
cyril
Register now or login to post to this thread.