


1 April 2008 |
Oil & Liquids (mmbbls) |
Gas (bcf) |
Total (mmboe) |
1P Reserves |
3.85 |
47.2 |
11.7 |
2P Reserves |
7.87 |
97.22 |
24.1 |
3P Reserves |
16.25 |
322.39 |
70.0 |
The next independent reserve report is expected to be published by 31 March 2009
Assets:Eugene Island (blocks 172, 183, 184)A-6 well flowing at 498 boepd (374 boepd working interest). Awaiting recompletion from primary zone during Q1 2009.
A-7 well flowing at 2177 boepd (1623 boepd working interest). Well originally tested at approx 4000 boepd, but water level have been increasing.
A-8 well flowing at 2557 boepd (1918 boepd working interest).Grand Isle (blocks 95, 100)
Assessing seismic data, finalising well plansShip Shoal (block 201)
Commencing operations during 2009. Fast tracking drill of wells 1 and 2.South Marsh Island (blocks 5, 6)
Block 6 due to be drilled in first half of 2009.
Installing platform and pipeline.Sorrento Dome
Drilling plans finalised. Seeking drilling rig for well 13-1.
LDP news - RSS Feed