Sharesmagazine
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Share Price   Awards   Market Scan   Videos   Broker Notes   Director Deals   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Indices   Forward Diary   Forex Prices   Shares Magazine   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Comparison Tables   Spread Betting 
You are NOT currently logged in
Register now or login to post to this thread.

Xcite Energy - North Sea Heavy Oil (XEL)     

Proselenes - 22 Oct 2009 11:14

.

mnamreh - 26 Jun 2012 09:25 - 2795 of 3002

.

Balerboy - 26 Jun 2012 13:17 - 2796 of 3002

come on herman spit it out.,.

HARRYCAT - 26 Jun 2012 13:21 - 2797 of 3002

Bizarre, he has deleted all past posts & continues to do so.

mnamreh - 27 Jun 2012 14:42 - 2798 of 3002

.

Sequestor - 28 Jun 2012 07:04 - 2799 of 3002

bit of a stinker?

markymar - 28 Jun 2012 08:08 - 2800 of 3002

I think that’s putting it polite Sequestor

The fundamentals are still in tacked but with markets and funding it’s just been terrible all the way down to how the management.

Oil is there and it will come to ground so still money to be made.

dreamcatcher - 09 Jul 2012 16:43 - 2801 of 3002

Commencement of Pre-Production Flow Test
RNS
RNS Number : 2298H
Xcite Energy Limited
09 July 2012



TSX-V, LSE-AIM: XEL



Xcite Energy Limited

("Xcite Energy" or the "Company")







9 July 2012



Commencement of Pre-Production Flow Test



The Company announces that it has now successfully completed the final part of the 9/03b-7 & 7z well lateral well construction work programme, including installation of the smart completions equipment (enabling individual laterals to be flowed, co-mingled or shut-in), the installation of twin electrical submersible pumps (giving full redundancy) and a down hole safety valve.



The on-rig process and control packages have been fully commissioned and linked to the pipeline and in-field dynamically-positioned shuttle tanker, Scott Spirit.



The pre-production flow test operations on the 9/03b-7 (B6) lateral well were successfully commenced this morning and the well is currently being cleaned up. This flow test is not a headline flow rate test; it is a data gathering exercise.



The 9/03b-7 lateral well is planned to recover a minimum cumulative volume of 45,000 barrels of oil during the flow test period, to help ensure that the data gathering will be as effective as possible and will be used to calibrate the existing reservoir model and update the Reserves Assessment Report.



This flow test is planned to be up to 90 days in length and to be conducted at a range of different flow rates (specifically not 500 barrels per day for 90 days), to collect additional reservoir and production data, including data with respect to enhanced oil recovery. This data will be used to further increase the certainty with respect to the longer term oil, gas and water production profiles and recoverable reserves from the Bentley field.









Commenting on today's announcement Steve Kew, Exploration and Development Director, said:



"We are very pleased with the production test work programme to date, with all major elements having been completed safely and competently. This is a significant step forward for the Company in proving its technical capabilities in the drilling of these wells with the multi-lateral smart completions that have been installed. The start-up of the production test has gone well and we shall continue to provide operational updates in due course."


markymar - 11 Jul 2012 12:21 - 2802 of 3002

11 July 2012



Xcite Energy Limited

("Xcite Energy" or the "Company")



Pre-production Flow Test Update


The Company is pleased to announce that the pre-production flow test is progressing well, with the planned shut-in period and pressure build-up test having been commenced on 11 July following the initial, successful, clean-up and first oil flow on 9 July. This planned shut-in period and pressure build-up test is designed to obtain key information about the Bentley reservoir and the mobility of its fluids for use in interpreting the subsequent flow data and for planning the next step of the Bentley field development. Following this build-up test, the flow test will continue as planned.

dreamcatcher - 11 Jul 2012 16:00 - 2803 of 3002

At long last movement.

mnamreh - 11 Jul 2012 16:19 - 2804 of 3002

.

dreamcatcher - 11 Jul 2012 16:23 - 2805 of 3002

Oil & Gas Sector: Xcite is top riser after positive update on pre-production flow test
StockMarketWire.com
North Sea oil firm Xcite Energy (LON:XEL) was the sector's biggest riser after it revealed that its pre-production flow test is progressing well.

It said the planned shut-in period and pressure build-up test began today (11 July) following the initial, successful, clean-up and first oil flow on 9 July.

This planned shut-in period and pressure build-up test is designed to obtain key information about the Bentley reservoir and the mobility of its fluids for use in interpreting the subsequent flow data and for planning the next step of the Bentley field development.

Following this build-up test, the flow test will continue as planned.

Xcite Energy's shares were up by more than 17% in late afternon trading.


dreamcatcher - 11 Jul 2012 16:24 - 2806 of 3002

Lets hope the sp gets there for them m

mnamreh - 11 Jul 2012 16:34 - 2807 of 3002

.

dreamcatcher - 11 Jul 2012 16:38 - 2808 of 3002

Averaged down again today. Lets hope it does m , looks good.

markymar - 11 Jul 2012 17:07 - 2809 of 3002

Still out of pocket huge time with these,i have just tucked them away and try not to look at the huge paper losses.

Cant wait to read FD negative slant on them.

Sequestor - 11 Jul 2012 18:02 - 2810 of 3002

The trouble is this will encourage people with losses to cut them, unless the resource is proven to be many times more than expected, it may be a damp squib

GLA

magicjoe - 16 Jul 2012 13:06 - 2811 of 3002

another good rise today and now looking for next target 90p

dreamcatcher - 19 Jul 2012 07:06 - 2812 of 3002

Pre-production Flow Test Update
RNS
RNS Number : 0011I
Xcite Energy Limited
19 July 2012



NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION IN WHOLE OR IN PART DIRECTLY OR INDIRECTLY IN, INTO OR FROM ANY JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OR REGULATIONS OF SUCH JURISDICTION



TSX-V, LSE-AIM: XEL





19 July 2012



Xcite Energy Limited

("Xcite Energy" or the "Company")





Pre-production Flow Test Update



The Company is pleased to announce that the pre-production flow test is progressing well.



Following the build-up and shut in test, the flow test has been continued as planned, with a gradually increasing flow rate having been undertaken during optimisation of process equipment, to the current stabilised rate of approximately 2,900 barrels per day. This is viewed as being well within the operational performance of the reservoir.



Bentley crude oil collected thus far in the Scott Spirit tanker is in excess of 10,000 barrels.


dreamcatcher - 19 Jul 2012 07:08 - 2813 of 3002

http://www.moneyam.com/action/news/showArticle?id=4410742

dreamcatcher - 03 Aug 2012 07:05 - 2814 of 3002

Operational Update - Pre-production Flow Test


http://www.moneyam.com/action/news/showArticle?id=4421216
Register now or login to post to this thread.