dreamcatcher
- 19 Feb 2013 19:28
skinny
- 03 Sep 2015 16:41
- 381 of 424
skinny
- 07 Sep 2015 07:02
- 382 of 424
HARRYCAT
- 30 Sep 2015 13:56
- 383 of 424
Annual Financial report
http://www.moneyam.com/action/news/showArticle?id=5122726
Last para from The Chairman:
"The creation of long-term value for our shareholders remains the fundamental driver of everything we do and we look forward to demonstrating this as we develop our ambitious plans and achieve our goals. With the Company's highly prospective licences, drilling underway, and funding in place, I believe the Company is well positioned for future success by growing production and reserves, and transforming Range into a significant oil producing company, which is not yet reflected in today's share price."
cp1
- 30 Sep 2015 14:49
- 384 of 424
might not be reflected in the share price but it's sure reflected in the market cap!
Perhaps he meant pre dilution and dilution and dilution and dilution and dilution and ...........
dreamcatcher
- 05 Oct 2015 17:05
- 385 of 424
HARRYCAT
- 02 Nov 2015 08:28
- 386 of 424
skinny
- 09 Nov 2015 07:22
- 387 of 424
dreamcatcher
- 03 Dec 2015 14:06
- 388 of 424
Trinidad Operations Update
RNS
RNS Number : 8144H
Range Resources Limited
02 December 2015
Trinidad Operations Update
Drilling programme
Range is pleased to advise that the third development well of the 22 well programme, the GY 161 S well spudded on 27 November 2015 and is drilling ahead to a total depth of 2,000 ft. It is expected to take approximately 21 days to reach target depth. The GY 161 S well is the second development well to be drilled by the Company on its Beach Marcelle field. Depending on results, the well may be used as part of a waterflood pattern in the future.
The drilling services are being provided by Range Resources Drilling Services Limited ("RRDSL"), a wholly owned subsidiary of LandOcean Energy Services Co., Ltd. The well is being drilled using rig 2.
The 180SE was the first well drilled on the Beach Marcelle block earlier in November. The log evaluation has been completed and the results are encouraging. A total of 72 ft. of net oil sand has been encountered and the Company is looking to submit for approval to perforate the well.
Approvals received for Morne Diablo waterflood expansion
The Company is delighted to announce that it has received all necessary government and regulatory approvals for the Morne Diablo waterflood expansion programme.
As previously announced, the Company has a pilot waterflood in place, which was established to obtain data and test operational and reservoir parameters to aid in the planning of the larger expansion model. Given success of the pilot scheme, the larger scale expansion in the Shallow Forest horizon is underway. The original oil-in-place in the expansion area is estimated by Range to be approximately 6.5 mmbbls, of which 1.35 mmbbls (21%) has been produced by primary depletion. Studies indicate that this plan could produce another 1.15 mmbbls (18%).
Initial water injection is expected to commence during the current month and first production is expected in 2H 2016.
As previously announced, the Company also applied for the required government approvals for Beach Marcelle waterflood and expects to receive these shortly.
CPR statement
In Accordance with AIM Rules, Guidance for Mining and Oil & Gas Companies, the information contained in this announcement has been reviewed and approved by Dr Douglas Field. Dr Field is a petroleum and reservoir engineer who is a suitably qualified person with over 30 years' experience in assessing hydrocarbon reserves, and holds a PhD in Organic Chemistry. Dr Field is a member of the SPE (Society of Petroleum Engineers) and the PESGB (Petroleum Exploration Society of Great Britain). The reserves information in this announcement has been prepared in accordance with the guidelines of the Society of Petroleum Engineers (SPE).
Glossary
Original oil in place is that quantity of petroleum that is estimated to exist originally in naturally occurring accumulations. It includes that quantity of petroleum that is estimated, as of a given date, to be contained in known accumulations prior to production plus those estimated quantities in accumulations yet to be discovered.
dreamcatcher
- 22 Dec 2015 17:29
- 389 of 424
HARRYCAT
- 13 Jan 2016 08:40
- 390 of 424
StockMarketWire.com
Range Resources has provided an update on its operations in Trinidad. Highlights are as follows:
* Approvals for the implementation of the Beach Marcelle waterflood project have been received;
* 12 wells have been approved for conversion to water injectors on the Morne Diablo waterflood project. Initial water injection has commenced;
* Third development well of the 22 well programme has reached its total depth with a total of 130 ft. of net oil sand encountered and the well Is being tested; and
* In addition, a new upper zone on the existing QUN 47 well has been perforated, with the well flowing a stabilized rate of 50 bopd from this new zone.
HARRYCAT
- 19 Jan 2016 10:57
- 391 of 424
StockMarketWire.com
Range Resources advises it has received a notice from Agencia Nacional de Hidrocarburos (ANH), National Hydrocarbons Agency of Colombia, which states that the licences over the three exploration blocks, PUT-5, VMM-7, and VSM-1 have been revoked.
The licences were awarded to a consortium of Optima Oil Corporation ("Optima") and the Company in December 2012.
ANH alleges that this is a result of the exploration work commitments not being fulfilled and presentation of invalid letters of credit by Optima.
The aggregate value of the exploration work commitments for the three licences amounts to approximately US$53 million. Under the terms of the Joint Operating Agreement ("JOA") between the consortium parties, it is the sole responsibility of Optima to complete the work commitments and provide all necessary letters of credit.
Both the Company and the consortium are obtaining legal advice with regard to this matter and it is currently anticipated that the consortium will lodge an appeal against the decision. The Company will update shareholders as appropriate.
Colombia is a non-core asset and Range had nil value attributed towards its interest in the three blocks on its balance sheet as at 30 June 2015. Under the JOA, Range has a 10% fully carried interest with other parties being Optima (80%) and Petro Caribbean Resources Ltd. (10%).
HARRYCAT
- 14 Mar 2016 07:42
- 392 of 424
New well spuds in Trinidad
Range is pleased to advise that approval for the new 4,000 m drilling rig has been granted to RRDSL (a wholly owned subsidiary of LandOcean Energy Services Co., Ltd). Subsequently, the MD 51-1 development well (renamed MD 250 well) successfully spudded on 10 March 2016 using the rig. The well is drilling ahead to a total depth of 4,150 feet and is expected to take four to five weeks to reach target depth.
The MD 250 well is the first development well to be drilled using one of RRDSL's new rigs. The well will test deeper horizons of the Upper and Middle Cruse sand trends and explore the potential of out-step drilling. MD 250 is a directional well from the previously drilled MD 248 well location.
The Upper Cruse sands, though penetrated by numerous surrounding wells, have not been fully exploited in this area of the Morne Diablo field. The Middle Cruse sands have been identified as well-developed in nearby wells with some of those having produced in excess of 100,000 barrels from this horizon during the well life.
As previously announced, RRDSL successfully completed construction of a three-cellar drilling pad during 2015. Initially, the MD 250 well will be drilled from the drilling pad. Drilling of further wells from the drilling pad will be evaluated dependent on the results from this well.
Further three new drilling rigs of RRDSL are currently undergoing certification and will be brought into drilling operations once approved.
HARRYCAT
- 15 Mar 2016 08:51
- 393 of 424
StockMarketWire.com
Range Resources has widened its H1 pretax loss from continuing operations to USD24.3m, from USD13.1m. Revenue was USD4.3m, from USD7.8m. It was fully funded for its upcoming exploration, development and waterflood programme.
OPERATIONAL HIGHLIGHTS:
* The average oil production in Trinidad of 561 bopd was broadly unchanged from 545 bopd from the same period last year;
* The Company published updated reserves statement (1P of 19.4 mmbbls; 2P of 22.0 mmbbls and 3P of 27.6 mmbbls);
* Significant progress on the waterflood programmes continued with approvals for Morne Diablo and Beach Marcelle projects received. The Company identified implementation of these projects as the highest priority;
* Water injection on Morne Diablo project underway and expected to commence on Beach Marcelle during Q2 2016;
* Three development wells successfully drilled and put on production. The Company plans to drill a number of additional high impact wells onshore Trinidad during 2016; and
* Exploration work on the St Mary's and Guayaguayare licences continued, including preparations for spudding of the Canari North exploration well.
HARRYCAT
- 01 Apr 2016 10:28
- 394 of 424
StockMarketWire.com
Range Resources said the MD 250 development well in Trinidad was successfully drilled to a total depth of 4100 feet by March 28.
During drilling, hydrocarbon sands and oil shows were encountered at depths of 1,350 ft. and between 3,500-3,600 ft. with an estimated net pay of over 100 ft.
Log evaluations are currently underway. The well is proposed to be completed using 5 1/2" casing string and cemented to surface, after which individual geologic targets will be selectively perforated and tested, pending approvals from the regulatory bodies.
This is the first of the five well drilling programme which Range has planned for 2016. The remaining scheduled wells include two development wells in Morne Diablo, one development well in Beach Marcelle, and one exploration well in the Guayaguayare block.
dreamcatcher
- 13 Apr 2016 20:27
- 395 of 424
Multiple hydrocarbon zones identified on MD 250
RNS
RNS Number : 9979U
Range Resources Limited
12 April 2016
Multiple hydrocarbon zones identified on the MD 250 well
Highlights:
· Multiple hydrocarbon bearing zones have been identified following initial log evaluations on the MD 250 well;
· Four lower zone intervals will be perforated and tested first, with an estimated net pay of over 40 feet;
· Other promising multiple intervals located in the middle and upper zones of the well will be tested thereafter, with an estimated net pay of over 100 feet; and
· RRDSL's additional three new drilling rigs are undergoing certification, expected to be received during the current quarter.
Range is pleased to announce that initial log evaluations on the MD 250 development well in Trinidad are highly encouraging with multiple hydrocarbon bearing zones identified, which will now be tested to determine the well's producing potential.
The Company will commence a production testing programme by perforating and testing four sand intervals located in the lower zone of the well between 3,350 and 3,900 feet with an estimated net pay of over 40 feet. The relevant approvals have been submitted to the regulatory bodies in Trinidad.
Once testing on the lower zone has been completed, the Company plans to test further multiple promising intervals of the well, located in the middle and upper zone of the well between 1,350 and 2,700 feet, with an estimated net pay of over 100 feet, pending approvals from the regulatory bodies in Trinidad.
The MD 250 well was drilled to a total depth of 4,100 feet, significantly ahead of the expected drilling schedule and was completed using a 5 1/2" casing string and cemented to surface. This is the first well to be drilled using RRDSL's (a wholly owned subsidiary of LandOcean Energy Services Co., Ltd) new 4,000 m rig.
As previously announced, during 2015 RRDSL successfully completed construction of a three-cellar drilling pad on the location. Once production testing on the MD 250 well has been completed, the Company will evaluate the possibility of drilling any follow on wells from the drilling pad dependent on the results from this well. As a standard practice and in line with safety requirements, production operations on a pad area are performed after the drilling of all the wells on that pad is completed. Therefore, if the Company decides to drill follow on wells from the drilling pad, all wells will be brought into production only once all drilling operations on the pad are completed.
RRDSL's further three new drilling rigs are undergoing certification and will be brought into drilling operations once approved. As advised by RRDSL, approvals are expected to be received during the current quarter.
Competent Person statement
In accordance with AIM Rules, Guidance for Mining and Oil & Gas Companies, the information contained in this announcement has been reviewed and approved by Dr Douglas Field. Dr Field is a petroleum and reservoir engineer who is a suitably qualified person with over 30 years' experience in assessing hydrocarbon reserves, and holds a PhD in Organic Chemistry. Dr Field is a member of the SPE (Society of Petroleum Engineers) and the PESGB (Petroleum Exploration Society of Great Britain).
Glossary
Net pay is a reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay.
HARRYCAT
- 09 May 2016 18:35
- 396 of 424
StockMarketWire.com
Range Resources has signed an agreement with the Petroleum Company of Trinidad and Tobago Ltd to reduce the overriding royalty rates (ORRs) on its producing Morne Diablo, Beach Marcelle and South Quarry fields.
The revised ORRs will apply when the received oil price is below USD50 a barrel. The changes will be effective from March 16 and will apply retrospectively to sales made from Feb. 1 onwards.
Assuming a WTI price of USD45 a barrel, this change would have minimal net revenue1 benefit to Range at current production levels.
"However, the impact will progressively increase at higher production levels with the net revenue benefit estimated to be approximately 7% at 2,500 bopd, assuming the same oil price," Range said in a statement.
"The reduced ORRs are particularly encouraging for operators like Range who are committed to growing their production in Trinidad over the coming years and are a welcome incentive introduced by Petrotrin during this period of sustained lower commodity prices."
Range also notes the comments by the Honourable Colm Imbert, the Minister of Finance of Trinidad and Tobago, in the 2016 Mid-Year Budget Review held on 8 April, 2016 that the Government intends to review the level of Supplemental Petroleum Tax (SPT) on crude oil prices moderately higher than US$50 per barrel.
This review is anticipated to be completed by September 2016.
HARRYCAT
- 17 May 2016 22:23
- 397 of 424
StockMarketWire.com
Range Resources has reached a binding agreement with Lind Asset Management to settle all outstanding claims and disputes between the parties, allowing it to draw a line under this long-running dispute.
"As previously announced, Lind initiated legal action in New South Wales Supreme Court seeking payment of approximately USD600,000 in respect of interest and legal costs. Lind also sought other damages for breach of contract," it said in a statement.
Range filed a defence against the claims and a cross-claim for damages.
Under the terms of the settlement agreement, Range has made a payment to Lind of USD325,000 and Lind will retain the beneficial ownership of the 38 million collateral shares which were issued by Range in 2014 as part of the original funding agreement.
HARRYCAT
- 27 May 2016 08:37
- 398 of 424
StockMarketWire.com
Range Resources said its voluntary suspension on ASX will not affect its share trading on AIM.
Range is in the process of appointing an Australian resident director, as a result of David Chen ceasing to be an Australian resident, as part of the requirements under Australian Corporations Act and ASX Listing rules.
The Company requested the voluntary suspension on ASX to be in place until it releases an announcement regarding the new appointment, and expects to make the announcement before the commencement of trading on Monday, 6 June 2016.
dreamcatcher
- 31 May 2016 07:58
- 399 of 424
Beach Marcelle Waterflood Commences
RNS
RNS Number : 6254Z
Range Resources Limited
30 May 2016
Beach Marcelle Waterflood Commences
The Company is pleased to provide an update on its waterflood projects in Trinidad with the following highlights:
· Injection on the flagship Beach Marcelle waterflood project has commenced;
· Two injector wells are being used to inject water, at an average initial rate of approximately 600 bwpd, which will gradually increase as additional wells and surface facilities are commissioned;
· Waterflood injection on the Morne Diablo project is continuing, with water rates increased to the maximum volume of water currently available;
· Agreement reached with Petrotrin to access additional water supply for Morne Diablo project with contracts to be signed shortly; and
· Waterflood projects will be key contributors to the Company's production growth over the coming years.
Beach Marcelle Waterflood - South East Block
The project implementation on the South East block of Beach Marcelle field has been successfully progressing over the last months. As a result, initial water injection has commenced, on schedule with the previously anticipated timelines.
The waterflood pattern on the block comprises 10 injector and 15 producer wells. The selected wells are undergoing workover operations using two workover rigs, with five wells completed as injectors and four as producers to date.
Two injector wells are currently being used to inject water, at an average initial rate of approximately 600 barrels of water per day ("bwpd"). In line with the planned implementation programme, injection volumes will be low at first, gradually increasing as additional wells and surface facilities are commissioned. Injected water is expected to be available from shallow aquifer wells (water source wells). The selected water source wells are also currently undergoing workover operations.
The first production as a result of waterflooding is anticipated during Q1 2017. The average production over the 8-year period is expected to be approximately 1,600 bopd, with production estimated over the plateau period of three years of 2,000 bopd.
The original oil-in-place in the South East block is estimated by the Company at 37.5 mmbbls, of which 6.2 mmbbls (17%) has been produced by primary depletion. Waterflooding is estimated by the Company to recover another 4.8 mmbbls over the next 8 years.
Morne Diablo Waterflood - Expansion Project
As previously announced, the initial water injection on the project commenced in December 2015.
The waterflood plan involves the use of up to 14 injectors and 14 producers. Four injector wells are currently being used to inject water. The water injection has been increased from 150 bwpd to 250 bwpd, which is the maximum volume of water available at present from Range's production wells.
To get access to additional water source supply, Range has been negotiating with Petrotrin to use produced water from Petrotrin's existing operations, which will increase water injection by 3,000 bwpd. The Company is pleased to advise that the agreement with Petrotrin has been reached and expects to sign the contract shortly.
The Company will be constructing a new water pipeline to connect Morne Diablo field to Petrotrin's water treatment facility. The environmental approvals for use of the additional water and construction of the new water pipeline have been submitted to the regulatory body in Trinidad.
The average production over the 8-year period is expected to be approximately 200 bopd, and is forecast to be achieved when water injection is increased to approximately 3,000 bwpd.
The original oil-in-place in the expansion area is estimated at 6.5 million barrels of oil (mmbbls), of which 1.3 mmbbls (20%) has been produced by primary depletion. Waterflooding is estimated by the Company to recover another 0.6 mmbbls over the next 8 years.
Additional Waterflooding Areas
The Company has identified additional areas around the previously drilled development wells in the South Quarry and Morne Diablo fields, which could be suitable for waterflooding. The Company will continue to evaluate these areas and study the field for waterflooding potential. If deemed economically feasible, Range will proceed with the relevant approvals to implement these projects.
As previously advised, Range and LandOcean are continuing to progress with finalising the terms for the US$50 million trade financing package with Sinosure. Pending completion of the Sinosure facility, LandOcean will provide Range with credit terms of 720 days for all work undertaken as part of purchase order 2 of US$50 million, including the waterflood programme.
Yan Liu, Range's Chief Executive Officer, commented:
"I am extremely pleased with the commencement of injection on our second waterflood project. Beach Marcelle is the largest waterflood project to be implemented in recent times in Trinidad and the team has been working tirelessly to bring it on line. It will be key to our production growth in the coming years, with first production from this project expected at the beginning of next year.
I look forward to working closely and leading our team during this period of unprecedented operational activity and demonstrating the results to all shareholders."
HARRYCAT
- 22 Jun 2016 07:40
- 400 of 424
StockMarketWire.com
Range Resources (RRL) received approval to spud the MD 51-2 development well, which is expected to spud early next month.
The workover programme on existing wells was reviewed to focus on the most economic wells, while credit terms by LandOcean on drilling services and PO1 were extended by 12 months, to allow the company to repay credit from future cashflows once production ramps up.
It will be a directional well to be drilled to a total depth of 3,900 feet to test the Middle and Upper Cruse sands, which were encountered with the MD 250 well.
Initial log evaluations on the MD 250 development well identified multiple hydrocarbon bearing zones, with an estimated net pay of over 140 feet.
The well will be drilled from the same drilling pad as the MD 250 well, using a 4,000 metre rig. The wellhead is located approximately 20 feet from the MD 250 well and drilling company RRDSL is in the process of moving the rig to the well location.
In line with safety requirements, production testing operations of the MD 250 and MD 51-2 wells will be performed only once all drilling operations on the pad area are completed.
This is the second of the six well drilling programme, which Range has planned for 2016.
The remaining scheduled wells include two development wells in Morne Diablo, one development well in Beach Marcelle, and one exploration well in the Guayaguayare block.
RRDSL's further three new drilling rigs are pending final approvals from the Ministry of Energy and Energy Industries (MEEI).
Approvals cannot be granted until all documentation on the rigs, as requested by the MEEI, is provided by RRDSL.
RRDSL is working on acquiring the requisite documents for submission to the MEEI. As advised by RRDSL, approvals are expected to be received in Q3 2016.
As part of the company's cost management, Range completed a workover programme review. The company reduced various workovers to focus on the most economic wells.
Range conservatively estimates that five development wells from the 2016 work programme will add approximately 500 barrels of oil per day (bopd) to current production levels by the end of 2016.
Range reiterates its previous production guidance of 2,500 bopd by the end of 2017, with the majority of this production growth to come from waterflood projects.