KEY quarterly out and its Nyuni-2 drilling in December !! :
http://www.keypetroleum.com.au/reports/QuarterlyReportfortheQuarterEnded30June2010.pdf
and from that:
...........NYUNI EXPLORATION PROSPECTS -
Following a TCM/OCM held in June, the Nyuni Joint Venture has decided to drill the Nyuni #2 exploration well during December 2010. It is planned that this well will be directionally drilled from Nyuni Island, in the North east of the Nyuni block, to a subsurface target location some 1.47 kilometres to the east, beyond the edge of the continental shelf. The well will crestally test a very large anticlinal closure that was drilled in 2003 / 04 by the Nyuni #1 well which discovered a 15m gas column in an Albian-Aptian sandstone body. At that time the gas bearing zone was not flow tested for operational reasons.
The deeper Neocomian sand unit which hosts the Kiliwani North and Songo Songo gas reservoirs was found to be water bearing in Nyuni #1 and represents the primary objective for the forthcoming well. A hydrocarbon / water contact was not established in Nyuni #1 and the Joint Venture Operator has estimated a mean resource potential of some 1 Tcf gas in the Nyuni Anticline..........