Proselenes
- 09 Aug 2010 17:56
- 507 of 562
Looks good to me :) !
08/09/2010 05 12410 DRLD T/ 12410'; LOGGED; RUNNING PROD CSG;
9th August Update
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2?p_wsn=241566
Drilled to 12410 feet / Logged / Running Production Casing.
Proselenes
- 09 Aug 2010 21:24
- 508 of 562
The TD pre drill was 12290 feet, so they actually ended up 120 feet lower down at 12410.
Hopefully that means extra thick pay zone......... :)
Proselenes
- 10 Aug 2010 11:04
- 512 of 562
Overhang looks to be clear.......
required field
- 22 Sep 2010 10:03
- 520 of 562
Could be a jump up in the sp here...or another slump to 6p.....taking their time over testing the Wilcox sands...hope this is not another Likonde debacle.....as the results took ages to filter through....
required field
- 22 Sep 2010 13:21
- 523 of 562
News must be coming.....just hoping it is good.....another gamble...this one....
Sir Dominic
- 23 Sep 2010 21:18
- 525 of 562
I'm still waiting and actually I was wondering if anyone's still here :):):)