Sharesmagazine
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Share Price   Awards   Market Scan   Videos   Broker Notes   Director Deals   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Indices   Forward Diary   Forex Prices   Shares Magazine   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Comparison Tables   Spread Betting 
You are NOT currently logged in
Register now or login to post to this thread.

Leed Petroleum - commercially productive drilling (LDP)     

ValueMax - 08 Jan 2008 08:18

leed_petroleum_logo.pngChart.aspx?Provider=Intra&Code=LDP&Size=Chart.aspx?Provider=EODIntra&Code=LDP&Si
1 April 2008 Oil & Liquids (mmbbls) Gas (bcf) Total (mmboe)
1P Reserves 3.85 47.2 11.7
2P Reserves 7.87 97.22 24.1
3P Reserves 16.25 322.39 70.0
The next independent reserve report is expected to be published by 31 March 2009
Asset Summaryassetswb1.jpg Operations Mapmapdd0.jpg Oil Pricechart?chart_primary_ticker=ICEEUR:BRN&ch
Assets:Eugene Island (blocks 172, 183, 184)A-6 well flowing at 498 boepd (374 boepd working interest). Awaiting recompletion from primary zone during Q1 2009. A-7 well flowing at 2177 boepd (1623 boepd working interest). Well originally tested at approx 4000 boepd, but water level have been increasing. A-8 well flowing at 2557 boepd (1918 boepd working interest).Grand Isle (blocks 95, 100) Assessing seismic data, finalising well plansShip Shoal (block 201) Commencing operations during 2009. Fast tracking drill of wells 1 and 2.South Marsh Island (blocks 5, 6) Block 6 due to be drilled in first half of 2009. Installing platform and pipeline.Sorrento Dome Drilling plans finalised. Seeking drilling rig for well 13-1. LDP news - RSS Feed

niceonecyril - 04 Jul 2008 14:13 - 93 of 235

Nil PD; Welcome, nothing to serious i hope?
cyril

sranmal - 04 Jul 2008 14:15 - 94 of 235

The "A" site appears to be down. BTW, hello everyone, haven't checked in at moneyam for yonks, so have just read this whole thread. Seems a whole lot "calmer" over here than on the other site (I'm the author of that MF post a few months ago, I have the same username on MF, here and the other site).

Pugugly - 04 Jul 2008 14:24 - 95 of 235

stranmal:> The other site is down - nor sure how long so followed you over for a look. Where to you see LED going - they have certainly appear to have had success with this last well but I have not yet been able to put a likely figure on production.

Nil Pd - 04 Jul 2008 14:24 - 96 of 235

Hi niceonecyril: dunno but it's still down, as sranmal says (he started the LDP thread on "A" site). The down time on A D N F V could indicate a major failure!

Hi sranmal!

sranmal - 04 Jul 2008 14:29 - 97 of 235

Wasn't me who started the thread on the A site, that was chopsy!

re. A-7 production: With the sidetrack, they've encountered thicker sands. With a 41 ft pay sand to produce from, I'd be happy with something like 1,500 boepd, although anything over 1,000 boepd would be significant in the current pricing climate. Note that the mix of oil:gas may not be the same as A-6, from my research, the 50:50 mix in the A-6 is exceptional, I've seen ranges from all gas to 50:50 splits in my research of other wells in the region.

Let's hope that when A-7 comes on, we can move up over previous high and the presistant seller moves his selling price higher.

ValueMax - 04 Jul 2008 14:31 - 98 of 235

Hello folks. It's nice to be a popular thread for a change, even if its only because that other site has crashed!

Pugugly, the most likely production level is around 5000boepd once A-7 goes live, assuming a similar output to A-6.

niceonecyril - 04 Jul 2008 14:32 - 99 of 235

sranmal; welcome and hope to see you posting a lot more, as your experiance in
the oil field would be most valued.
cyril

Nil Pd - 04 Jul 2008 14:34 - 100 of 235

Ooops, sorry! Was it MTA then?

sranmal - 04 Jul 2008 14:39 - 101 of 235

Nil Pd - not even MTA(!), have started a few though - IEC, PANR, EEL (now defunct), AEY.

Thanks for the kind words folks.

Nil Pd - 04 Jul 2008 14:45 - 102 of 235

That was it PANR. I am (temporarily) completely out of PANR, so I haven't visited that thread for a while.

Anyway, sorry for O/T. When was the next event expected here at LDP, was it A8 or was it possible access to extra financing? Without being able to refer to the many excellent summaries on N D A V F I forget...

olivercromwell - 04 Jul 2008 14:48 - 103 of 235

another AVDNF refugee. What's up at t'other site anyway?

hope they haven't gone bankrupt!

olivercromwell - 04 Jul 2008 14:49 - 104 of 235

christ, even the bloody stockwatch on moneyam is down n 'all

:(

someuwin - 04 Jul 2008 14:50 - 105 of 235

Ah - this is where everyone is today then!

Nil Pd - 04 Jul 2008 14:59 - 106 of 235

Damn! Too many of us using the free time on Stockwatch reduces shared time to - zero!

olivercromwell - 04 Jul 2008 15:02 - 107 of 235

I pay for full access! Quite happy actually, it's not the fault of the guys at moneyam, i suspect its the data provider

ValueMax - 04 Jul 2008 15:05 - 108 of 235

Stockwatch is working fine for me. I pay for MAM level 2 though.

Nil Pd, A-8 won't start until A-7 has commenced production, so confirmation that A-7 is producing will come first. Reserves upgrade likely this quarter too. Financing isn't really a big issue unless an imminent acquisition is planned.

sranmal - 04 Jul 2008 15:06 - 109 of 235

Various things expected soon:

- A-7 flowrate and hook-up
- A-8 spud
- Possible reserves update
- Extra financing(?), possible significant increase (IPO financing was secured on production, with gas hedges in place. With significantly increased production and gas price, if new financing is secured on same terms, ie. production, significantly higher funds may be made available with current revenue generation of Company). Something else to think about - with major ramp up of cashflow, could they get by without raising too much money?
- Rig(s) contract - current rig only contracted for A-8. Also, may need to ramp up drilling schedule to satisfy drilling commitments on certain blocks.
- Possible revised drilling schedule, adding in 2 recent blocks.

Nil Pd - 04 Jul 2008 15:22 - 110 of 235

Thanks sranmal and ValueMax. I'll save the summary (only recently joined in with LDP so I need to gather these kind of data - can't remember it all - as I did for MTA, PANR, etc).

Pugugly - 04 Jul 2008 15:27 - 111 of 235

VM:> Thansk

someuwin - 09 Jul 2008 08:27 - 112 of 235

moving up today
Register now or login to post to this thread.