MoneyAM MoneyAM
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Research   Share Price   Awards   Indices   Market Scan   Company Zone   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Stock Screener   Forward Diary   Forex Prices   Director Deals   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Videos   Comparison Tables   Spread Betting   Broker Notes   Shares Magazine 
You are NOT currently logged in

 
Filter Criteria  
Epic: Keywords: 
From: Time:  (hh:mm) RNS:  MonAM: 
To: Time:  (hh:mm)
Please Note - Streaming News is only available to subscribers to the Active Level and above
 


Touchstone shares jump on Cascadura environmental certificate

ALN

Touchstone Exploration Inc shares rose on Wednesday after the Trinidad & Tobago Environmental Management Authority granted the company a certificate for environmental clearance for its Cascadura project.

Shares in the Calgary, Canada-based upstream oil and gas company were up 10% to 108.00 pence each in London on Wednesday.

The Cascadura project is in the Ortoire block, onshore Trinidad, in which Touchstone holds an 80% operating interest in the block. Heritage Petroleum Co Ltd holds the remaining 20% interest.

Touchstone said that the CEC approves the construction of a multi-well surface production facility at the Cascadura project. It noted that the facility is designed to have a production capacity of 200 million cubic feet of natural gas per day, 5,000 barrels per day of associated liquids and 200 barrels per day of produced water, with a storage capacity of 8,800 barrels of liquids on the Cascadura A wellsite.

In addition to the facility, the CEC includes the drilling of eight wells at two well pads, Cascadura B and C, and the establishment of associated pipelines and infrastructure within the Ortoire block.

National Gas Company of Trinidad & Tobago Limited has begun activity in the field to commence the construction of the 1.7 kilometre, 20-inch pipeline to the Cascadura facility, Touchstone added.

Chief Executive Officer Paul Baay said: ‘It has been a thorough process, but the positive outcome now allows us to establish a clear and measurable five-year development plan for the discovery. We are working with our local contractors, and construction is underway at local fabrication shops for various aspects of the facility with all major facility components already delivered to Trinidad.’

Copyright 2022 Alliance News Limited. All Rights Reserved.