MoneyAM MoneyAM
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Research   Share Price   Awards   Indices   Market Scan   Company Zone   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Stock Screener   Forward Diary   Forex Prices   Director Deals   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Videos   Comparison Tables   Spread Betting   Broker Notes   Shares Magazine 
You are NOT currently logged in

 
Filter Criteria  
Epic: Keywords: 
From: Time:  (hh:mm) RNS:  MonAM: 
To: Time:  (hh:mm)
Please Note - Streaming News is only available to subscribers to the Active Level and above
 


Pantheon Resources shares up as completes clean out of Alkaid 2 well

ALN

Pantheon Resources PLC shares were up on Thursday, after it said it has completed the clean out of the sand blockage in the Alkaid 2 well, Alaska.

Pantheon Resources is a London-based oil and gas exploration and production company focused on the US state of Alaska. It fully owns several oil projects spanning 153,000 acres adjacent and near to transportation and pipeline infrastructure on the Alaska North Slope.

The company’s shares were up 3.4% at 55.65 pence each in London on Thursday morning.

Pantheon said that the clean out of the sand blockage in the Alkaid 2 well is now complete. The Nordic Calista 2 rig has moved off the Alkaid 2 well head after replacing the production tubing.

It noted that the beginning of these operations were delayed due to poor weather and a number of electrical and hydraulic issues with the rig. These have now all been resolved.

The company is now connecting Alkaid 2 to the production facility in preparation for the resumption of the long term production testing operations which will recommence shortly.

The entire facility will now run on power completely generated with produced gas without any ancillary equipment, it added.

Chief Executive Jay Cheatham said: ‘I’m excited to resume flow testing soon, with a clean wellbore which will flow directly into our impressive permanent facility, which was designed, procured, built and commissioned in a single season.

‘We encountered a number of equipment issues which slowed progress over the past few weeks but I am happy to report that all these are now behind us and we can look forward to continuing flow testing.’

Copyright 2023 Alliance News Ltd. All Rights Reserved.