MoneyAM MoneyAM
 Home   Log In   Register   Our Services   My Account   Contact   Help 
 Stockwatch   Level 2   Portfolio   Charts   Research   Share Price   Awards   Indices   Market Scan   Company Zone   Traders' Room 
 Funds   Trades   Terminal   Alerts   Heatmaps   News   Stock Screener   Forward Diary   Forex Prices   Director Deals   Investors' Room 
 CFDs   Shares   SIPPs   ISAs   Forex   ETFs   Videos   Comparison Tables   Spread Betting   Broker Notes   Shares Magazine 
You are NOT currently logged in

 
Filter Criteria  
Epic: Keywords: 
From: Time:  (hh:mm) RNS:  MonAM: 
To: Time:  (hh:mm)
Please Note - Streaming News is only available to subscribers to the Active Level and above
 


Touchstone completes testing at Ropyston-1X; aims to begin pumping

ALN

Touchstone Exploration Inc on Thursday said it has completed its programme of five production test intervals at its Royston-1X well.

The Calgary, Canada-based oil and gas company focused on Trinidad & Tobago said the well is shut-in while it waits for the arrival of a service rig which will be used to put the well on pump to enable further testing.

‘We expect that once the well is pumping, the hydrostatic pressure on the reservoir will be reduced, allowing the formation fluid to produce at increased rates,’ the company said.

The firm has an 80% operating interest in the Royston-1X well, as well as the Cascadura and Coho wells, Heritage Petroleum Company Ltd holds the remaining 20%.

Meanwhile, the company said its Cascadura facility is undergoing final commissioning. It said upon commission, it will begin to introduce natural gas and associated liquids its Cascadura-1ST1 and Cascadura Deep-1 wells.

At the Coho well, Touchstone said said it intends to reconfigure the producing reservoir intervals, noting that it will undertake this work after the Cascadura facility comes into operation.

Chief executive Paul Baay said: ‘Testing of the Royston-1X well was undertaken in a methodical manner to provide a comprehensive evaluation of the prospect. The flow and buildup tests for each interval has provided us with information that could be used for future stimulation of the well to optimize recovery and production rates. The fact that we have recovered light oil and significant pressures on each test is encouraging. We now need to evaluate the mechanics of how to produce the well at economically sustainable rates. By putting the well to pump for an extended period, we will be able to determine both the economics and viability of future operations, which could include artificial stimulation of the reservoir.

‘Looking forward to the commencement of commercial production from the Cascadura facility, we now have in place the infrastructure to process and monetize all future potential drilling successes on the Ortoire block. This has been a long process, but we have now put in place the building blocks for a fully funded, full-cycle exploration and production strategy.’

Touchstone shares fell 11% to 67.50 pence each on Thursday morning in London.

Copyright 2023 Alliance News Ltd. All Rights Reserved.