Wishbone Gold PLC - miner with projects in Western Australia - Drilling operations commence at Red Setter Gold Dome project in Western Australia following the successful mobilisation of contract drillers to the site. ‘Access routes have now been opened, and the drillers have mobilised to site and established the necessary site works to drill. As of yesterday, the rig was over the first of two drill holes that are to be deepened from around 300 metre depth down to around 550m target depth and had successfully run casing to near the bottom of the first hole. We expect further drilling towards the new target depths in the days ahead,’ says Wishbone Gold WA Director Ed Mead. Current stock price: 0.59 pence, up 2.2% on Monday afternoon in London 12-month change: down 33% Copyright 2025 Alliance News Ltd. All Rights Reserved.
|