oilwatch
- 20 Jun 2007 14:14
mitzy
- 11 Jul 2016 08:13
- 346 of 523
Top riser this morning and more to come.
Martini
- 11 Jul 2016 08:25
- 347 of 523
:)
Bullshare
- 11 Jul 2016 09:17
- 348 of 523
Martini: Think we are in the money:-)
Tendrara Update
Sound Energy, the European / Mediterranean focused upstream gas company is pleased to provide the following update in relation to the Company's Tendrara licence area, onshore Morocco.
As announced by the Company on 6 June 2016, the first Tendrara well (TE-6) was drilled to a measured vertical depth of 2,665 metres and encountered approximately 28 metres of net gas pay in the TAGI reservoir.
The Company confirms that rigless operations continue and that the results are already significantly above Company expectations as a significant stable flow has already been achieved, despite only having accessed so far 18% of the total reservoir and no stimulation having yet been performed.
After completing the initial perforation of 5 metres of the 28 metres of net pay (between 2,601 and 2,606 metres) the well achieved a stable flow rate of 1.36 MMscf/d with a choke of 16/64".
The Company will now complete the remainder of the rigless operation, after which the results will be announced. The results are expected later this month.
James Parsons, Sound Energy's Chief Executive Officer, commented:
"I am absolutely delighted to report what appears to be an early and potentially very material success at the first of our three Strategic Plays.
We eagerly await the post stimulation flow rate but I believe the early results of this first well already both prove a material commercial rate at Tendrara and provide significant early clues as to the regional potential of the Eastern Morocco TAGI reservoir."
This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.
Martini
- 11 Jul 2016 18:17
- 349 of 523
Not quite a gusher yet :)
fred49
- 14 Jul 2016 15:45
- 350 of 523
45p is the next calling station. So much potential in the pipeline. Good luck to all holders.
fred49
- 14 Jul 2016 18:41
- 352 of 523
This is not GKP. 45p within 10 days.
fred49
- 19 Jul 2016 23:32
- 353 of 523
it could reach 45p 2 days early.
fred49
- 29 Jul 2016 22:32
- 354 of 523
told ya
Martini
- 30 Jul 2016 09:02
- 355 of 523
Ya did :)
Bullshare
- 31 Jul 2016 15:10
- 356 of 523
Nice;-)
mitzy
- 01 Aug 2016 08:06
- 357 of 523
60p this morning incredible.
dreamcatcher
- 01 Aug 2016 17:16
- 358 of 523
Well done for holders of sound. :-))
Martini
- 01 Aug 2016 19:52
- 359 of 523
Sold half and running the rest. Never a bad thing to take some profit.
kimoldfield
- 02 Aug 2016 07:43
- 360 of 523
Very wise, unless you did like me and sold way too soon!!😒
dreamcatcher
- 02 Aug 2016 18:05
- 361 of 523
I don't think the world could take two of you. lol
HARRYCAT
- 08 Aug 2016 07:55
- 362 of 523
StockMarketWire.com
Sound Energy has confirmed a significant gas discovery and a potential single gas column at its Tendrara licence, onshore Morocco. As previously announced, the first Tendrara well, TE-6, was drilled to a measured vertical depth of 2,665m, encountered the top of the structure and approximately 28m of net gas pay in the TAGI reservoir.
The company has now completed operations and is delighted to announce that it has on 7 August 2016 achieved a stabilized gas flow rate, post stimulation, of 17.0 MMscf/d (0.5 million scm/d).
"This is significantly above initial expectations and represents a highly commercial rate," Sound Energy said in a statement.
"The Company is also very pleased to report a reservoir bottom hole pressure of 420 bars and that the static pressure recorded in the well correlates, in terms of gas gradient, with all of the wells previously drilled in the licence area."
The combination of these factors together with the fact that none of the historically drilled wells on the licence have identified a gas/water contact, suggests the possibility of a significant gas column within a continuous extended structure.
This structure may include and extend beyond the reservoir identified at TE-2, some 30km to the North East. A further well (the Company's third well - TE-8) will be required at the edge of the potential structure to confirm this and is now being planned for later this year.
The Company, together with Schlumberger, is now preparing for the second well at Tendrara (TE-7, located approximately 1.3km from TE-6) using sub-horizontal drilling techniques which are expected to significantly increase the individual well flow rate in a success case.
This will be followed by an extended well test. The rig-up process at TE-7 is already complete and drilling is expected to commence during August 2016.
TE-6 will be suspended until the results of TE-7 are confirmed.
Bullshare
- 08 Aug 2016 09:39
- 363 of 523
Great announcement, £1 before Xmas?
M
Martini
- 08 Aug 2016 09:48
- 364 of 523
:)
Bullshare
- 08 Aug 2016 11:04
- 365 of 523
Listened to the conf call just held. James is talking value of company up, as he would, and it could be £10 plus per share in due course. Fairly balanced discussion.